Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Site work, paving and outdoor lighting for a mixed-use development in Milwaukee, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for outdoor lighting for a road / highway; and water / sewer project.
Solicitation Id: SE-02 The purpose of this project is to address the deteriorating pavement condition and decreasing ride quality along STH 59 (W Greenfield Avenue/W National Avenue), as well as to address aging and outdated traffic signal equipment, substandard curb ramps, maintenance concerns, and to assess inconsistent multimodal accommodations along the corridors. Rehabilitation project to replace concrete pavement and subgrade improvements of STH 59 approximately 0.39 miles long from S 76th St to S 70th St and STH 59 approximately 0.92 miles long from S 70th St to S 56th St within the City West Allis, in Milwaukee County. Curb ramps will be reconstructed to meet ADA standards, Sidewalk improvements, replacement of existing signal equipment, replacement of street lighting and Storm Sewer upgrades. Anticipated Construction Cost: $15,000,000-$16,999,999 DBE Goal: DBE Goal in $ 0.00 Anticipated Project Start Date: 02/02/2026 Anticipated Project Completion Date: 06/01/2032 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - C West Allis, Greenfield Ave *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$16,999,999.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2026
WI-59, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Oct 16 2025
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Nov 06 2025
Milwaukee, WI
Bid Date: Oct 08 2025
Milwaukee, WI
Bid Date: Oct 09 2025
Milwaukee, WI
Bid Date: Nov 06 2025
Milwaukee, WI
Bid Date: Nov 14 2025
Milwaukee, WI
Bid Date: Oct 08 2025
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Nov 21 2025
Milwaukee, WI
Bid Date: Nov 07 2025
Milwaukee, WI
Bid Date: Oct 17 2025
Milwaukee, WI
Bid Date: Sep 24 2025
Milwaukee, WI
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
