BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

Renovation of an educational facility in Springfield, Missouri. Completed plans call for the renovation of a educational facility.

Selective Door Upgrades at SPS High Schools: Project#621636 Central HS Glendale HS Hillcrest HS Kickapoo HS Parkview HS Study Alternative Center Question Deadline 10/09/2025 at 4:30 PM CT ABOUT THE DISTRICT The District provides education for over 24,000 students in K-12 and is the largest district in Missouri. Its boundaries cover over 138 square miles and encompass the City of Springfield, Missouri and parts of the City of Battlefield and Greene County. The District's facilities currently include the following: 29 elementary schools (K-5), 2 elementary schools (K-4), 6 middle schools (6-8), 1 intermediate school (5-6), 4 combination schools (K-8), 5 high schools (9-12), and 6 early childhood centers. In addition to these school buildings, the District has a center for gifted education and a center for alternative education. The District owns and maintains six support facilities providing administrative, operational, and educational services. Doors identified in the scope to be replaced will be replaced with the same style of door. See DIV 08 for door hardware specifics. New 3M Ultra S800 security film will need to be installed on new doors that have glass. Doors that require paint shall be painted as follows: Primer: Sherwin Williams Extreme bond primer. Paint: Sherwin Williams Water based alkyd urethane (WBAU). Color: seal skin (low sheen/satin), unless Owner states otherwise. 2 coats required. All doors need to be sanded, cleaned, and prepped properly before priming and painting. Door frames will need to be painted where new doors are installed. Contractor responsibility to dispose of old doors/frames/hardware unless Owner states otherwise. The District reserves the right to award by line, by group, all or none. Awards will be made in the best interest of the District.Additional information on door replacements: CHS Door 14 - Replace Door, new solid panel above door, not glass CHS Door 19 - Replace door and frame, new hardware and new closer. CHS Door 22 - Replace door and frame, new hardware and new closer. GHS Door 8 - continuous hinge, keep frame, new metal door w/ 6x30 window, security film, new exterior hardware, reuse existing panics. Security film. GHS Door 9 - New metal door, keep frame, reuse panics, no glass in this door. GHS Door 13 - New metal door, no glass but needs peephole, make outswing door, add door closer.GHS Door 14 - Replace with "like" style door. GHS Door 20 - Replace with "like" style door. KHS Door 3 - Metal door with 6x30 window kit, security film required on glass. Reuse continuous hinges. KHS Door 26 - Metal door with 6x30 window kit, security film required on glass. Existing hardware will be reused. The windows above door do not need to be replaced, door and frame can be replaced without removing windows. KHS Door 27 - Metal door with 6x30 window kit, security film required on glass. Reuse the one panic that is new. PHS Door 2 - new hollow metal door, panics, closers. PHS Door 18 - replace frame and door, reuse panics and lever, add new closers, add new keyed removable mullion PHS Door 19 (ALTERNATE #1 ON BID FORM) - replace door and frame and all associated glass/frame. Reuse panics, add new closers, add keyed removable mullion. Security film. PHS Door 23 - new wide style aluminum door, 10" bottom rail, new panics, new closers and pull, security film PHS Door 24 - Replace door and frame, new hardware and new closer. PHS Door 25 - Replace door and frame, new hardware and new closer. PHS Door 26 - Replace door and frame, new hardware and new closer. Door 27 (ALTERNATE #2 ON BID FORM) - replace door and frame. PHS Door 28 (ALTERNATE #3 ON BID FORM) - replace door and frame. Study Door 16 - Replace door and frame, new hardware and closer Study wooden doors - Replace with metal doors, solid panel will need to be installed above

Award

Educational

$505,723.00

Public - City

Renovation

3

10

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
22
Bidding Soon
570
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

October 29, 2025

Project location map

Multiple Locations, Springfield, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.