BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Renovation of a clubhouse / community center in Hastings, Florida. Working plans call for the renovation of a clubhouse / community center.

**As of December 4, 2025, bids received were rejected as they were over the budget. Project will be rebid but no definite date yet.** The project involves replacing windows at the W.E. Harris Community Center located at 400 E. Harris St., Hastings FL 32084. The current windows are single hung single pane glass, aluminum frame construction, and color bronze. The new windows must be energy efficient, aluminum storefront, bronze color meeting all applicable building codes. This is a grant funded project. Bidders must obtain and review the bid documents, including all attachments and exhibits, as well as any issued addenda, for full details and instructions regarding submittal format, full scope of services, minimum qualifications and all other information related to this bid. St Johns County has been awarded 275,490.00 through the United States Department of Energy (DOE), Energy Efficiency and Conservation Block Grant (EECBG) program. These funds will be used for window replacement at the W.E. Harris Center located in Hasting Fl. The current windows are single hung single pane glass, aluminum frame construction, and color bronze. The new windows must be energy efficient, aluminum storefront, bronze color meeting all applicable building codes. This is a grant funded project. All the terms and conditions are included in this solicitation. Location: o 400 E Harris St, Hastings Fl, 32145 Overall Budget: o 275,490.00 Terms and Conditions for Grant: o See Exhibit 2 - U.S. DOE Grant Special Terms & Conditions Basis of Design: o Kawaneer Company, Inc TriFab 450 Aluminum Store Front & Entry System (HVHZ) (NonImpact) Attached. o Thisis what was provided to the DOE for approval. o SJC Would accept other manufacturers providing their products meet all applicable terms and conditions listed above. This may have to be resubmitted to the DOE.SOW: o The Contractor shall be responsible for providing all permitting, bonds, labor, materials, scaffolding, machinery, hoists, transportation, employee safety equipment, equipment, and supervision required to complete turnkey window replacement per the terms and conditions included in this bid. o The Contractor issolely responsible for the proper fitment of the windowsinto the existing openings. Measurements given are for estimating only. The Contractor is to field verify before bidding. Final measurements will be solely the contractor's responsibility. o The Contractor is to remove and properly dispose of the existing windows and all trash generated from this project. o Contractor is to properly seal (per manufacturer specs) and touch up paint (matching colors) all window jambs on the affected windows. o Contractor shall clean new glass and work area after installation. o Work is to be done during normal business hours: Monday through Friday, 8:00 AM - 5:00 PM. inquiries shall be directed to Richard E. Poulin Jr., in writing, via email at rpoulin@sjcfl.us. In the event the Designated Point of Contact is absent or otherwise unavailable for more than three (3) business days, firms may contact Diana Fye, Senior Procurement Coordinator at dfye@sjcfl.us. Question Deadline 10/01/2025 at 4:00 PM ET

Final Planning

Clubhouse / Community Centers

$275,490.00

Public - County

Renovation

21

10

2

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
55
Bidding Soon
1,695
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2025

June 4, 2026

Project location map

400 Harris St, Hastings, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.