Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 16, 2025 at 8:00 PM
Updated October 25, 2025
Demolition, site work and addition to a water / sewer project in Fountain Inn, South Carolina. Conceptual plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.
Renewable Water Resources (ReWa) is soliciting Statements of Qualifications (SOQ) from eligible engineering firms (Firms) to provide engineering services for the Durbin Creek WRRF Expansion project (Project). The Project will utilize a Construction Manager at Risk (CMAR) delivery method. Engineering services will include assistance with CMAR selection prior to beginning detailed design. Contracts awarded for this project may be funded by a loan from the South Carolina State Revolving Fund (SRF) or by other grants/loans from SCDES or other Federal agencies. If SRF funding is obtained, the project will be subject to federal contracting requirements associated with the funding. In anticipation of these funds, ReWa will apply federal contracting requirements and will be responsible for oversight of these requirements. This project will also have Davis Bacon and American Iron and Steel requirements. Q&A Deadline : 10/13/2025 5:00 PM (EDT). Online Q&A : Yes. The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
$500,000.00
Public - City
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2025
SC-418, Fountain Inn, SC
Related To This Project
Fountain Inn, SC
Bid Date: Dec 15 2025
Fountain Inn, SC
Bid Date: Feb 06 2026
Fountain Inn, SC
Bid Date: Mar 24 2026
RFP Construction Manager at Risk - Fountain Inn ES K8 Conversion - Addition and Renovation - 5900261
Fountain Inn, SC
Bid Date: Sep 30 2025
Fountain Inn, SC
Bid Date: Aug 11 2025
Fountain Inn, SC
Bid Date: May 29 2025
Fountain Inn, SC
Bid Date: Apr 08 2025
Fountain Inn, SC
--
Fountain Inn, SC
Bid Date: Feb 24 2025
Fountain Inn, SC
Bid Date: Mar 21 2019
Fountain Inn, SC
Bid Date: Sep 30 2025
Fountain Inn, SC
Bid Date: Dec 14 2020
Fountain Inn, SC
Bid Date: Sep 05 2024
Fountain Inn, SC
--
Fountain Inn, SC
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
