Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 5, 2025 at 7:00 PM
Updated November 6, 2025
Site work and paving for a sidewalk / parking lot in Chino Hills, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
As of November 05, 2025, this project has not yet been awarded. The project is expected to be awarded on November 20,2025. Ayala High School Student Parking Lot Asphalt Repair The Contract Time is 189 calendar days from the date of the Notice to Proceed. Each bidder shall be a licensed contractor pursuant to the California Business and Professions Code, and be licensed to perform the work called for in the Contract Documents. The successful bidder must possess a valid and active Class A and/or C-12 California State Contractor's License at the time of bid and throughout the duration of this Contract. Subcontractors shall be licensed pursuant to California law for the trades necessary to perform the work called for in the Contract Documents. Each bid must strictly conform with and be responsive to the Contract Documents as defined in the General Conditions. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. Each bidder shall submit with its bid, on the form furnished with the Contract Documents, a list of the designated subcontractors on this Project as required by the Subletting and Subcontracting Fair Practices Act, California Public Contract Code section 4100 et seq. In accordance with California Public Contract Code section 22300, the District will permit the substitution of securities for any moneys withheld by the District to ensure performance under the Contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the District, or with a state or federally chartered bank as the escrow agent, who shall then pay such moneys to the Contractor. Upon satisfactory completion of the Contract, the securities shall be returned to the Contractor. The Contractor and all subcontractors shall furnish certified payroll records as required pursuant Labor Code section 1776 directly to the Labor Commissioner in accordance with Labor Code section 1771.4 on at least on a monthly basis (or more frequently if required by the District or the Labor Commissioner) and in a format prescribed by the Labor Commissioner. Monitoring and enforcement of the prevailing wage laws and related requirements will be performed by the Labor Commissioner/ Department of Labor Standards Enforcement (DLSE.) Each bidder's bid must be accompanied by one of the following forms of bidder's security: (1) cash; (2) a cashier's check made payable to the District; (3) a certified check made payable to the District; or (4) a bidder's bond executed by a California admitted surety as defined in Code of Civil Procedure section 995.120, made payable to the District in the form set forth in the Contract Documents. Such bidder's security must be in an amount not less than ten percent (10%) of the maximum amount of bid as a guarantee that the bidder will enter into the proposed Contract, if the same is awarded to such bidder, and will provide the required Performance and Payment Bonds, insurance certificates and any other required documents. In the event of failure to enter into said Contract or provide the necessary documents, said security will be forfeited. The Contractor and all Subcontractors shall comply with the requirements set forth in Division 2, Part 7, Chapter 1 of the Labor Code. The District has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which this work is to be performed for each craft, classification or type of worker needed to execute the Contract. These per diem rates, including holiday and overtime work, as well as employer payments for health and welfare, pension, vacation, and similar purposes, are on file at the District, and are also available from the Director of the Department of Industrial Relations. Pursuant to California Labor Code section 1720 et seq., it shall be mandatory upon the Contractor to whom the Contract is awarded, and upon any subcontractor under such Contractor, to pay not less than the said specified rates to all workers employed by them in the execution of the Contract. A Contractor or Subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in the Labor Code, unless currently registered and qualified to perform public work pursuant to Section 1725.5. The successful contractor shall supply all labor, materials, services, insurance, and equipment necessary to complete the work. The Contractor shall thoroughly investigate the premises for a complete understanding of the scope of work required for this bid. North Parking Lot - Area A o Take out and haul away 68,449 Sq Ft of asphalt and subgrade 10" in depth. o Grade, weed kill and pave 68,449 Sq Ft with 4" of asphalt over 6" of rock base. o Furnish and install 187 new 4' concrete wheel stops. o Form and pave 8 new asphalt speed bumps 3'x25'x3" per existing conditions. South Parking - Area B o Take out and haul away 73,752 Sq Ft of asphalt and subgrade 10" in depth. o Grade, weed kill and pave 73,752 Sq Ft with 4" of asphalt over 6" of rock base. o Furnish and install 171 new 4' concrete wheel stops. o Form and pave 8 new asphalt speed bumps 3'x25'x3" per existing conditions. Bulldog Blvd.-Area C o Take out and haul away 28,943 Sq Ft of asphalt and subgrade 10" in depth. o Grade, weed kill and pave 28,943 Sq Ft with 4" of asphalt over 6" of rock base. o Form and pave 6 new asphalt speed bumps 3'x25'x3" per existing conditions. o Demo and dispose of existing chain link fencing, fence posts, and footings. o Furnish and install approx. 412 linear feet of new 4' chain link fencing, posts and gates per existing conditions. Entire Site o Temp, stripe per existing conditions o Clean and apply 2 coats of GuardTop seal coat to 171,144 Sq Ft of asphalt. o Seal coat to have 2% latex and 3lbs of sand per gallon. o Lay out and stripe per existing conditions with 2 coats of traffic paint. o Repaint all colored curbs with 1 coat of traffic paint. o Sq. FT. are approx, measurements contractors to verify. o After hours and weekend work may be needed to complete the project. o Awarded contractor will be responsible for leaving the school campus clean at the end of each visit and removal/haul away debris. Awarded contractor will be responsible to fence-off and secure work areas. No bidder may withdraw any bid for a period of ninety (90) calendar days after the date set for the opening of bids. Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required, and shall be provided to the District prior to execution of the Contract and shall be in the form set forth in the Contract Documents. All bonds (Bid, Performance, and Payment) must be issued by a California admitted surety as defined in California Code of Civil Procedure section 995.120. Where applicable, bidders must meet the requirements set forth in Public Contract Code section 10115 et seq., Military and Veterans Code section 999 et seq. and California Code of Regulations, Title 2, Section 1896.60 et seq. regarding Disabled Veteran Business Enterprise ("DVBE") Programs. Forms are included in this Bid Package. Any request for substitutions pursuant to Public Contract Code section 3400 must be made at the time of Bid on the Substitution Request Form set forth in the Contract Documents and included with the bid. Question Deadline 10/03/2025 Each request for clarification shall be submitted in writing, via email, to only the following persons: TO: Kathy Casino, Purchasing Director, kathy_casino@chino.k12.ca.us CC: Sam Sousa, Maintenance Director sam_sousa@chino.k12.ca.us
Bid Results
Sidewalks / Parking Lot
$760,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2025
November 10, 2025
14255 Peyton Dr, Chino Hills, CA
Related To This Project
Chino Hills, CA
Bid Date: Oct 23 2025
Chino Hills, CA
Bid Date: Dec 18 2025
Chino Hills, CA
Bid Date: Dec 11 2025
Chino Hills, CA
Bid Date: Jan 22 2026
Chino Hills, CA
Bid Date: Jan 15 2026
Chino Hills, CA
Bid Date: Jan 08 2026
Chino Hills, CA
--
Chino Hills, CA
--
Chino Hills, CA
--
Chino Hills, CA
--
Chino Hills, CA
Bid Date: Nov 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.