BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Demolition, site work, paving and new construction of a civil project in Covington Township, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

This Project is for the Rehabilitation of an Existing Structure on State Route 3002, Section D51, in Sterling Township, Wayne County, in the Commonwealth of Pennsylvania. The Project is Located Along Sr 3002 at the Structure Over Butternut Creek, From Segment 0110 Offset 0000 to Segment 0110 Offset 0034 and Butternut Road T-342 Sta. 11+00.00 to Sta. 15+50.00 Overall Length 330.00 Lf. The Proposed Work Involves Rehabilitation on the Existing Single Span Reinforced Concrete T-beam Structure Including Removal of the Bituminous Wearing Surface From the Top Side of the Deck and Apply Ppc Overlay, Upgrade the Existing Guide Rail System Along All Four (4) Quadrants, Bolted Directly to Retrofitted Bridge Barrier, Full Depth Pavement Replacement Immediately Adjacent to Bridge, Epoxy Injection Sealant to Be Applied to Cracks at Abutments and Wingwall Surfaces, Type 1 Concrete Surface Repair for Spalls and Delamination's to Abutments and Wingwalls, and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package. Traffic for Sr 3002 During Construction Will Be Maintained by Temporary Detour Using State and Local Roads. The Detour Will Be 3.8 Miles. Project Cost Range: $200,000.00 - $499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 39.00% Pre-bid Meeting: None Anticipated Ntp: 01/26/2026 Wage Rates: Yes Required Completion: 06/18/2026 Prequalification Requirement: Yes State Type of Work: Bridge Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - SR 3002 Over Butternut Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Bridges / Tunnels

$500,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

45

9

2

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
425
Active Projects
180
Bidding Soon
2,828
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

January 26, 2026

Project location map

State Rte 3002, Covington Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.