Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 29, 2026 at 7:00 PM
Updated January 30, 2026
Demolition, site work, paving, outdoor lighting and new construction of a civil project in Kennedy Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; road / highway; and water / sewer project.
This is a Partial Design Build Roadway Project. Design Activities Are Limited to: Ground Improvement, Interchange Artwork Mounting. For the Replacement of the Existing Partial Cloverleaf Interchange With a Diverging Diamond Interchange, Bridge Replacement, Drainage, Traffic Signals, Its, Highway Lighting, Signing and Pavement Markings, Sign Structures, and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 0022, Section A37, State Route 0060, Section A57, and State Route 0376, Section A78, in Allegheny County, Robinson Township, Commonwealth of Pennsylvania. This Project Being Situated as Follows: Sr 0022 - From a Point Approximately 1000 Feet West of Sr 0376 at Segment 0144/0145 Offset 0073/0073 (Station 105+20.00 Eb/wb) to a Point Approximately 100 Feet East of Sr 0376 at Segment 0144/0145 Offset 1473/1516 (Station 219+19.85 Eb/319+63.01 Wb) Sr 0060 - From a Point Approximately 100 Feet East of Sr 0376 at Segment 0234/0235 Offset 2212/2223 (Station 319+63.01nb/219+19.85 Sb) to Approximately Campbells Run Road at Segment 0220 Offset 3449 (Station 141+30.00 Nb/sb) Sr 0376 - From a Point Approximately 1000 Ft North of Sr 0022 Segment 0594/0595 Offset 1652/1734 (Station 17+00 Eb/wb) to a Point Approximately 1500 Feet South of Sr 0022 at Segment 0600/0601 Offset 1638/1638 (Station 43+00.00 Eb/wb) Project Cost Range: $50,000,000.00 - $59,999,999.99 Federal Project Status: Federal Oversight Dbe: 0% Structure Work: 32.00% Let Type: Scheduled Pre-bid Meeting: None Anticipated Ntp: 03/16/2026 Wage Rates: Yes Required Completion: 11/08/2029 Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - RFP D/B - Design Activities Are Limited to: Ground Improvement, Interchange Artwork Mounting *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Bridges / Tunnels
$60,000,000.00
Public - State/Provincial
Demolition, New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 12, 2026
March 16, 2026
Multiple Locations, Kennedy Township, PA
Related To This Project
Kennedy Township, PA
--
Kennedy Township, PA
--
Kennedy Township, PA
--
Kennedy Township, PA
Bid Date: Oct 09 2025
Kennedy Township, PA
--
Kennedy Township, PA
Bid Date: Jan 02 2025
Kennedy Township, PA
Bid Date: Jul 29 2024
Kennedy Township, PA
Bid Date: Jul 29 2024
Kennedy Township, PA
Bid Date: Jun 06 2024
Kennedy Township, PA
Bid Date: Aug 19 2020
Kennedy Township, PA
Bid Date: Nov 30 2023
Kennedy Township, PA
Bid Date: Mar 03 2022
Kennedy Township, PA
--
Kennedy Township, PA
Bid Date: Jan 31 2022
Kennedy Township, PA
Bid Date: Jan 31 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
