BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated November 20, 2025

This is a service / maintenance or supply contract in Kennedy Township, Pennsylvania. Contact the soliciting agency for additional information.

Initiating Organization: Engineering District 11-0 Agreement Type: Project Specific 100% State Funded: No Services Requested: Construction Management Part 1 Location Description State Route/Section Allegheny County 22/A37 Part Name: CM for SR 22-A37 ECMS 27445, SR 22-A37:This is a partial Design Build roadway project. Design activities are limited to: Ground improvement.For the replacement of the existing partial cloverleaf interchange with a Diverging Diamond interchange, bridge replacement, drainage, traffic signals, ITS, highway lighting, signing and pavement markings, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0022, SECTION A37, STATE ROUTE 0060, SECTION A57, and STATE ROUTE 0376, SECTION A78, in ALLEGHENY COUNTY, ROBINSON TOWNSHIP, Commonwealth of Pennsylvania.This project being situated as follows:SR 0022 - From a point approximately 1000 feet west of SR 0376 at Segment 0144 Offset 0073/Segment 0145 Offset 0073 (Station 105+20.00 EB/WB) to a point approximately 100 feet east of SR 0376 at Segment 0144, Offset 1473/ Segment 0145, Offset 1516 (Station 219+19.85 EB/319+63.01 WB)SR 0060 - From a point approximately 100 feet east of SR 0376 at Segment 0235 Offset 2223/Segment 0234 Offset 2212 (Station 319+63.01NB/219+19.85 SB) to approximately Campbells Run Road Segment 0220, Offset 3449 (Station 141+30.00 NB/SB)SR 0376 - From a point approximately 1000 ft north of SR 0022 Segment 0594 Offset 1652/Segment 0595 Offset 1734 (Station 17+00 EB/WB) to a point approximately 1500 feet south of SR 0022 Segment 0600 Offset 1638/ Segment 0601 Offset 1638 (Station 43+00.00 EB/WB)Requested Staffing: 1 Project Manager, 1 Technician and 1 Scheduler.Anticipated Completion Date: November 8, 2029 Anticipated NTP: March 16, 2026 Project Time: Day Time The goal for Disadvantaged Business Enterprise (DBE) participation in this agreement shall be 0 of the total agreement cost. Cost included in a DBE firm's price proposal as direct cost of work and services by others shall not count as DBE participation in this agreement, unless completed by a DBE firm. Additional information concerning DBE participation in this agreement is contained in the General Requirements and Information Section referenced below. PADOT - RFQ D/B - Construction Management for SR 22-A37

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
127
Bidding Soon
1,909
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2026

Project location map

Multiple Locations, Kennedy Township, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.