Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Site work and paving for a mixed-use development in Fort Wayne, Indiana. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The funding source for this project is STORMWATER UTILITY REVENUE. The Contractor shall furnish all labor, insurance, equipment, materials and power for the complete performance of the following project, Belmont Storm Improvements and Street Reconstruction as follows: New storm water system including installation of approx. 5370 LF of storm utility piping, 84 drainage structures, water main adjustments, grading; and road reconstruction including installation of 2470 SY of concrete sidewalk and approaches, 4578 LF of concrete curb, 4006 LF of underdrain, and 1565 tons of HMA surface and intermediate. all in accordance with the Bidding Documents as prepared by City Utilities Engineering Department, City of Fort Wayne, Indiana. No Bid will be accepted from, or contract awarded to any person, firm, or corporation that is in arrears to the City of Fort Wayne, Indiana, upon any debt or contract, or, who has failed to execute, in whole or in part in a satisfactory manner, any contract with the City; or, who is a defaulter as to surety or otherwise, upon any obligation to the City, or is engaged in litigation with the City. No Bid may be withdrawn for at least 60 days after the scheduled time for receipt of Bids so as to allow review of Bids before announcing award of Contract. The successful Bidder will be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. The City of Fort Wayne's goal for utilization of qualified Emerging Business Enterprises (EBE) as subcontractors on City projects is 10% of the Contract Price. It has been determined that the EBE goal for THIS PROJECT is 10% of the Contract Price QA date - 10-6-2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Design Manager in writing. Interpretations or clarifications considered necessary by Design Manager in response to such questions will be issued by the issuing office (herein QuestCDN) to all parties recorded as having received the Bidding Documents. Questions received less than ten (10) days prior to the date for opening of Bids may not be answered.

Award

Water / Sewer

$2,801,272.00

Public - City

Paving, Site Work

70

17

13

9

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
101
Bidding Soon
1,152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

November 17, 2025

Project location map

Multiple Locations, Fort Wayne, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.