Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 4, 2026 at 8:00 PM
Updated April 5, 2026
Demolition, site work, paving and new construction of a civil project in Paupack Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
This Project is for the Replacement of a Corrugated Metal Plate Pipe Culvert Located on Sr 590, Sec 653, in Paupack Township, Wayne County, in the Commonwealth of Pennsylvania. The Existing Bridge Structure Carries Sr 590 (Purdytown Turnpike) Over an Inlet to Moc-a-tec Lake, an Unnamed Tributary to Wallenpaupack Creek. The Existing Structure Spans Approximately 13'-5" of Supporting Roadway Embankment. The Proposed Structure is a Single Cell Pre-cast Reinforced Concrete Box Culvert 14'-6" in Length. Modifications to Both Vertical and Horizontal Alignments Will Be Minimal. Maintaining Traffic Along Sr 590 During Construction Will Be Maintained by a Temporary Run-around Roadway. Access to Adjacent Properties Will Be Maintain at All Times. The Temporary Run-around Roadway Will Be in Place for Approximately 6-7 Months Depending on Weather Conditions During Construction. The Project is Located on Sr 590 From Segment 0210 Offset 0376 to Segment 0210 Offset 1395, With a Total Project Length of 820 Linear Feet (0.155 Mi). Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 40.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - SR 590 Over Inlet to Lake Moc-A-Tec *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$1,575,123.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2026
April 27, 2026
PA-590, Paupack Township, PA
Related To This Project
Paupack Township, PA
Bid Date: Nov 07 2024
Mechanicsville, PA
--
Hamburg, PA
--
Spring Grove, PA
Bid Date: Feb 12 2026
York, PA
Bid Date: Jan 29 2026
Manchester Township, PA
Bid Date: Jan 29 2026
Belfast Township, PA
Bid Date: Jan 29 2026
Bethel Township, PA
Bid Date: Jan 29 2026
Monaca, PA
Bid Date: Oct 17 2025
Bethlehem, PA
Bid Date: Oct 29 2025
Dorneyville, PA
Bid Date: Oct 23 2025
Transfer, PA
--
Lake Latonka, PA
--
Meadville, PA
--
State College, PA
Bid Date: Feb 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
