Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
Site work for a water / sewer project in Spokane Valley, Washington. Completed plans call for site work for a water / sewer project.
This project consists of the installation of approximately 7500 LF of cure-in-place pipe (CIPP) in the following approximate quantities: 3000 LF of 8" dia., 1700 LF of 10" - 24" dia. and 2800 LF of 30" - 36" dia. Also included are reinstatements of side sewer reconnections, CCTV and cleaning, bypass pumping, traffic control and other related items. The City of Spokane will receive bids. Bid delivery noon to 1:oo p.m.: Construction Management Office 998 East North Foothills Drive Spokane, WA 99208 Gate entrance is off North Foothills Drive The City of Spokane, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252,42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Bids shall be submitted on the forms provided in accordance with the provisions of the Specifications. Irregular bid proposals will be rejected in accordance with the specifications. Cashier's check, a certified check or surety bond in the sum of five percent (5%) of the Total Project Bid must accompany the copy of the bid filed with the City Clerk. Successful bidder shall execute the Contract within TEN (10) calendar days after receiving the Contract. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated herein, the bid proposal deposit shall be forfeited to the City of Spokane. The City of Spokane will normally award this Contract or reject bids within FORTYFIVE (45) calendar days after the time set for the bid opening. If the lowest responsible Bidder and the City of Spokane agree, this deadline may be extended. If they cannot agree on an extension by the 45-calendar day deadline, the City of Spokane reserves the right to Award the Contract to the next lowest responsible Bidder or reject all Bids. Note regarding new specifications: The City of Spokane is using WSDOT's 2025 Standard Specifications. Note regarding new apprentice program requirements: Section 1-07.9(3) herein has been substantially revised including a new state GSP for projects over $2M. In accordance with SMC 7.06.500 and RCW 39.04.350(1), the low bidder shall complete the Supplemental Bidder Responsibility Criteria form located in Appendix B. Failure to promptly submit the form including supporting documentation if required may delay award of the Contract. Range: $1M to $1.5M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$1,295,816.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2025
November 19, 2025
To Be Determined, Spokane Valley, WA
Related To This Project
Spokane Valley, WA
--
Spokane Valley, WA
Bid Date: Nov 17 2025
Spokane Valley, WA
Bid Date: Dec 17 2025
Spokane Valley, WA
Bid Date: Dec 29 2025
Spokane Valley, WA
Bid Date: Dec 16 2025
Spokane Valley, WA
Bid Date: Dec 03 2025
Spokane Valley, WA
--
Spokane Valley, WA
--
Spokane Valley, WA
--
Spokane Valley, WA
Bid Date: Aug 08 2025
Spokane Valley, WA
Bid Date: Oct 27 2021
Spokane Valley, WA
Bid Date: Jul 11 2025
Spokane Valley, WA
Bid Date: Jul 17 2025
Spokane Valley, WA
--
Spokane Valley, WA
Bid Date: Aug 08 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
