BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated October 30, 2025

Site work for an educational facility in Danville, Illinois. Working plans call for site work for a educational facility.

As of 10/29/2025, These bids came in higher than expected. DACC is not planning to accept these bids and will not be awarding a contract at this time. For Technology Center Dust Collector Mechanical Email questions to GHR Engineers and Associates, Inc. Telephone (voice) queries are discouraged. 1. Email: shicks@ghrinc.com 2. Use the following subject line: "Danville Area Community College - Technology Center - Dust Collector". B. Bidder's questions will not be taken after 2:00 pm on Thursday, October 9, 2025 unless the bid opening date is changed by addendum. WORK INCLUDES A. Work covered by contract documents: 1. Bid Package 1: Installation of Owner-provided dust collector on grade, associated ductwork, spark detection and abort gate damper. See Sheet M1.SUMMARY A. Project identification: Danville Area Community College - Technology Center - Dust Collector B. Bid Package 1: Installation of Owner-provided dust collector on grade, associated ductwork, spark detection and abort gate damper. See Sheet M1. C. Particular project requirements: 1. 2. Existing site conditions and restrictions: The building will be occupied at the time of construction and care must be taken not to disturb normal operations of the occupants. D. Permits: Apply for, obtain, and pay for permits required to perform the work. Submit copies to Architect and Owner. E. Codes: Comply with applicable codes and regulations of authorities having jurisdiction. Submit copies of inspection reports, notices and similar communications to Architect. F. Dimensions: Verify dimensions indicated on drawings with field dimensions before fabrication or ordering of materials. Do not scale drawings. G. Existing Conditions: Notify Architect and Owner of existing conditions differing from those indicated on the drawings. Do not remove or alter structural components without prior written approval. H. Definition for terms used in the Specifications: 1. 2. Provide: Furnish and install, complete with all necessary accessories, ready for intended use. Pay for all related costs. 3. Approved: Acceptance of item submitted for approval. Not a limitation or release for compliance with the Contract Documents or regulatory requirements. Refer to limitations of "Approved" in General and Supplementary Conditions. 4. Match Existing: Match existing as acceptable to the Architect and Owner. 5. Intent: Drawings and Specifications are intended to provide the basis for proper completion of the work suitable for the intended use of the Architect and Owner. Anything not expressly set forth but which is reasonable implied or necessary for proper performance of the project shall be included.

Final Planning

Educational

$152,500.00

Public - City

Site Work

5

9

4

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
106
Bidding Soon
1,059
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

January 12, 2026

Project location map

2000 E Main St, Danville, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.