Published October 21, 2025 at 8:00 PM
Updated October 22, 2025
Renovation of a warehouse / distribution facility in Utica, New York. Completed plans call for the renovation of a warehouse / distribution facility.
The work includes removing three (3) existing overhead garage doors and their hardware and replacing them with new ones at the MVWA's Maintenance Facility at 1620 Kemble Street, Utica, NY, as per the specifications. Bids are to be submitted only on the provided forms and only by persons who have obtained bid documents from the Mohawk Valley Water Authority and are registered on the list of bidders. The MVWA reserves the right to waive any informality and reject any and all bids. They may also reject any bid if the resources, financial standing, or experience of the bidder justifies such rejection in view of the work to be performed. The Board may revise or amend the bidding documents prior to the bid opening date. Bid packages must be sealed, marked, and addressed properly to the Mohawk Valley Water Authority, Engineering Department. Bids delivered by courier must be delivered to the Water Authority's Engineering Department, 3rd Floor Office. Any inquiries regarding specifications must be submitted in writing. No response will be given to inquiries received within three business days of the bid date. Question Deadline 10/13/2025 Any inquiries regarding details in specifications must be directed in writing to Steve Gassner, Administrative Officer, of the MVWA at sgassner@mvwa.us. 1. Remove and dispose of all existing doors and hardware. 2. Install one (1) 450U Micro Groove 18'2" Wide X 14'0" High White Foam-In Place Polyurethane TorsionTrack: 3 IN Thick Standard Lift 15R Torsion Additional Strut Qty: 7 each. Brand needs to be similar or like quality. 3. Install one (1) 450U Micro Groove 10'2" Wide X 18'0" High White Foam-In-Place Polyurethane TorsionTrack: 2 IN Thick Standard Lift 15R Torsion Additional Strut Qty: 9 each. Brand needs to be similar or like quality. 4. Install one (1) 450U Micro Groove 10'2" Wide X 18'0" High White Foam-In-Place Polyurethane TorsionTrack: 2 IN Thick Standard Lift 15R Torsion Additional Strut Qty: 9 each. Brand needs to be similar or like quality. 5. LiftMaster Trolly Operator, 1/2 HP 120/240V Single Phase, 240V 3 Phase Add to Favorite Parts TDC7S1BMC14CPSU - 14'Door Height - CPSU. Brand needs to be similar or like quality. 6. LiftMaster Jackshaft Operators, 1/2 HP 120/240V single-phase, 240V 3 Phase JDC7S1BMCCPSU. Brand needs to be similar or like quality. 7. The driveways, parking lot, and building entrances shall be protected from debris during construction. The Contractor is responsible for safely conducting its operations to protect the public using the building. The Contractor shall repair at its expense any damage caused by its operations. 8. During the progress of the Work, the Contractor shall conduct his operations and provide adequate pollution controls to minimize the creation and dispersion of noise, odors, dust, dirt, mud, and/or debris within and beyond the site. The Contractor shall protect the building from water intrusion during the project. 9. Perform final job site cleaning and remove all job debris from site 10. Provide written contractors' and manufacturers' warranties. Minimum warranty periods are as follows: a. Contractor's Warranty (All Labor and Materials): 1 year. b. Manufacturer's Limited Warranty (Door Opener and Accessories): 1 year. c. Manufacturer's Limited Warranty (Door Hardware): 1 year. d. Manufacturer's Limited Warranty (Door Sections): 10 years. 11. The contractor shall submit to the owner manufacturer's specifications on overhead garage door prior to purchase and installation.
Bid Results
Warehouse / Distribution
$31,634.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 16, 2025
November 17, 2025
1620 Kemble St, Utica, NY
Related To This Project
Utica, NY
--
Utica, NY
--
Utica, NY
--
Utica, NY
--
Utica, NY
Bid Date: Oct 09 2025
Utica, NY
Bid Date: Nov 07 2025
Utica, NY
Bid Date: Nov 25 2025
Utica, NY
Bid Date: Nov 25 2025
Utica, NY
Bid Date: Oct 16 2025
Utica, NY
Bid Date: Nov 04 2025
Utica, NY
Bid Date: Oct 03 2025
Utica, NY
Bid Date: Oct 29 2025
Utica, NY
Bid Date: Sep 30 2025
Utica, NY
Bid Date: Sep 25 2025
Utica, NY
Bid Date: Sep 30 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.