BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000399828 This project aims to remedy an issue by the design and installation of one compressed air line diffuser system into each of the three developed cells labeled Hill Oakley, Ft. Lupton East, and Golden. This includes the diffuser system, air compression system, and related SCADA controls. In addition to the water quality limitations, the existing diversion from the Lupton Bottom Ditch into the Everist cells is severely limited by the 12" gate valve and approximately 100-feet of 12" pipeline leading up to a flume and 36" pipe. The inflow is indicated in the image above just southwest of the Ft. Lupton East cell. This leads to a limited inflow into the Everist Site. This project aims to expand that diversion structure and pipeline. Question Deadline 10/08/2025 at 2:00 PM MT Bid Submission Type Electronic Bid Submission, Any questions must be submitted in writing by email to Heidi Ellis, Senior Procurement Agent at heellis@auroragov.org and Justin Montes Project Manager, at jmontes@auroragov.org. Questions will be answered via addendum posted to online. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. In addition, the bid guarantee shall be accompanied in the same file as the bid. The Contract Documents require that all work be Substantially Complete by November 1, 2026, with Final Completion by December 31, 2026. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $1,700.00 per day. The estimated cost for this project is from $2,030,000.00 to $2,870,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$2,598,285.00

Public - City

Site Work

56

31

9

6

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
154
Bidding Soon
1,269
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

December 22, 2025

Project location map

Co Rd 18, Aurora, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.