BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 16, 2025

Site work for a multi-residential development in Rome, Georgia. Completed plans call for site work for a one-story above grade multi-residential development.

DEADLINE TO SUBMIT QUESTIONS Friday, September 26, 2025, at 12 pm Madonna Murphy, Director of Compliance Northwest Georgia Housing Authority Mailing address: P.O. Box 1428, Rome, GA 30162 Email: mmurphy@nwgha.com The Northwest Georgia Housing Authority (NWGHA) is requesting quotes from qualified vendors to supply and install a complete security camera system at one (1) housing authority property located at Jack Frost (807 Ave. B., Rome, GA 30165) and Barron Apartment, (800 N. 5th Ave., Rome, GA 30165, Rome, Georgia). The goal of this project is to improve safety, prevent criminal activity, and enable effective monitoring of common areas. The contract will begin upon execution of an Agreement of Service and continue for one year. The contract period may be extended for an additional two years upon the completion of the initial contract period and agreement of both parties. Unless otherwise stated in the contract, the contract term shall commence on the date specified in the Contract or Purchase Order issued by NWGHA. Conduct a site assessment of property. Design and propose a comprehensive camera surveillance solution tailored to site. Install all equipment, including cameras, mounts, cabling, network components, and storage. Configure a centralized monitoring and recording system (on-site and cloud-based). Configure remote access for authorized personnel. Train NWGHA staff on system use and maintenance. Provide regular maintenance services. Provide a layout or map of proposed camera placements. Specify camera types (fixed dome, bullet, pan tilt zoom, infrared). Include necessary specifications for: Resolution (minimum 4K) Weatherproofing (outdoor-rated IP 66 or better) Night Vision or Infrared capabilities (minimum 30 Meter Range) Power Supply: POE (Power Over Ethernet) Recording (minimum 30 days storage) NVR Specs: Storage at a minimum 30 days of retention Video Compression H.265 Remote Access Enabled AI Integration preferred Property A. A minimum of 95 and a maximum of 115 cameras will be utilized.

Post-Bid

Multi-Residential

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
194
Bidding Soon
2,154
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2025

November 14, 2025

Project location map

Multiple Locations, Rome, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.