BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2025 at 7:00 PM

Updated November 5, 2025

Remodeling of a conference / convention center in Ardmore, Oklahoma. Completed plans call for the remodel of a one-story above grade conference / convention center.

As of November 04, 2025, project was awarded to Cunningham Flooring America, awarded amount is $96,027.26. Sealed bids will be received for new flooring in the North Exhibit Hall at the Ardmore Convention Center, located at 2401 N. Rockford Road, Ardmore, OK. Bids must be submitted in a sealed envelope, clearly identifying the project, the bid number, and the name of the bidder. Bid security in the form of a cashier's check, certified check, letter of credit, or surety bond in the amount of five percent (5%) of the base bid must accompany each bid. The bidder must use the provided bid proposal and affidavits, which must be signed and notarized. Bids must be typewritten or in ink. The successful bidder will deliver the executed contract, bonds, and certificates of insurance as required, within fifteen (15) calendar days of notification, unless extended by the City/Authority. The City of Ardmore/Ardmore Tourism Authority reserves the right to change dates, reject any or all bids, waive formalities, and accept the bid deemed most advantageous for value received. Description of Work A. Project shall include, but not be limited to, all labor, parts, supplies and equipment to replace flooring as described by the Project Manager for the Ardmore Convention Center in Ardmore, Oklahoma. B. Work may require the demolition or alteration of existing systems; in which case, all material and debris shall be cleaned up and removed from site by the Contractor on a continuous daily basis. Fast-drying water-based primer used for priming surfaces before applying UZIN portland or gypsum-based self-leveling compounds. UZIN PE 260 can be used undiluted or diluted depending on surface absorbency. Also for use with UZIN thinset mortar, dispersion, and dry tape adhesives. Rapid-drying fine repair mortar used to smooth and fill imperfections of interior surfaces before installing floor covering material. Mixed with water, this polymer-modified compound of portland and select hydraulic cement can be applied to various surfaces, often without the requirement of a primer. Suitable for use with all floor coverings and adhesives. Inquiry Due Monday, October 6, 2025 by 5:00 P.M., C.S.T. If you have questions concerning the bid process, please contact Sherrill Shaw, Purchasing Coordinator, at (580) 221-2582, between the hours of 7:30 a.m. and 5:00 p.m., Monday-Thursday and 7:30 a.m. and 11:30 a.m. Friday

Award

Conference / Convention Centers

$96,027.00

Public - City

Remodeling

3

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

November 28, 2025

Project location map

2401 N Rockford Road Ardmore OK, Ardmore, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.