Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
Renovation of a day care center in Fallon, Nevada. Completed plans call for the renovation of a day care center.
**As of November 21st, 2025, the project was awarded to PEC Contracting and Engineering with an awarded amount of $864,442.94** Churchill County is currently accepting bids to perform renovations on four (4) existing buildings located at 280, 282, 290, and 292 Quail Way in Fallon, NV for the New Pass House and Day Center. The work shall include the following: Demo existing walls and doorways to improve accessibility for ADA requirements. Remove/replace carpet/tile, including baseboards. Construct interior walls. Remove and replace kitchen/bathroom fixtures, including toilets and supply lines. Remove existing hot water heaters and replace with tankless water heaters. Remove existing hot water boilers and registers for heating. Remove existing swamp coolers/window AC units. Remove and replace lighting fixtures with LED fixtures. Remove and replace all receptacles, switches, and wall plates. Prime and paint interior walls and ceilings. Install mini-split cooling system in units 280 and 282. Install mini-split heating/cooling system in units 290 and 292. Install wiring for cameras and door access points as required. Install security cameras and door access points. Project plans and scope of work are included in the specifications marked as Exhibit A in the bid document. The specification may be supplemented with more detailed drawings, descriptions, and requirements at the mandatory pre-bid meeting, which shall automatically become part of the bid packet.
Award
Day Care Centers
$864,443.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 6, 2025
December 8, 2025
Multiple Locations, Fallon, NV
Related To This Project
Fallon, NV
Bid Date: Dec 02 2025
Fallon, NV
Bid Date: Nov 20 2025
Fallon, NV
Bid Date: Dec 02 2025
Fallon, NV
Bid Date: Dec 02 2025
Fallon, NV
--
Fallon, NV
Bid Date: Dec 18 2025
Fallon, NV
Bid Date: Jan 08 2026
Fallon, NV
Bid Date: Jan 27 2026
Fallon, NV
Bid Date: Sep 04 2025
Fallon, NV
Bid Date: Aug 28 2025
Fallon, NV
Bid Date: Jun 30 2025
Fallon, NV
--
Fallon, NV
Bid Date: May 20 2025
Fallon, NV
Bid Date: Jan 08 2026
Fallon, NV
Bid Date: Mar 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
