BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Site work for a water / sewer project in San Francisco, California. Conceptual plans call for site work for a water / sewer project.

The San Francisco Public Utilities Commission (SFPUC) is soliciting interest and feedback for the implementation of the 525 Golden Gate On-Site Non-Potable Water System Project (Project). SFPUC will seek to engage potential builders and engineers for the delivery of the Project through a subsequent competitive process. This Request for Interest (RFI) is for informational purposes only. SFPUC does not guarantee the accuracy of any information contained herein. The information is general and preliminary in nature, subject to change, and will provide the basis for discussion and planning by the SFPUC. No person, entity, or other party is entitled to rely on this RFI or the information contained herein for any purpose, including without limitation, submitting a bid or proposal, or entering into a contract related to the Project. SFPUC will be upgrading its existing On-site Non-potable Water System (ONWS) at its headquarters in San Francisco (525 Golden Gate Avenue) to meet the new expected requirements set by the State Water Resources Control Board (SWRCB) Department of Drinking Water (DDW) draft regulations for on-site treatment and reuse of non-potable water, expected to be effective in April 2026. In addition to the new regulations by DDW, the upgrade of the ONWS shall meet the requirements set by the San Francisco Health Code Article 12C. The primary project objectives may include: 1. Providing a non-potable on-site treatment system to supply in-building non-potable demands (i.e., toilet and urinal flushing) in compliance with the upcoming SWRCB DDW draft regulations for on-site treatment and reuse of non-potable water as well as the San Francisco Health Code Article 12C requirements. 2. Providing a potable treatment system that produces purified drinking water suitable for tastings. 3. Updating the existing non-potable on-site rainwater and stormwater system to only collect rainwater (roof runoff) to be used for irrigation of the building planters and extending the irrigation system to irrigate existing LM wetland cells. 4. Providing flexible and reliable systems that protect public health and are simple and safe to operate. 5. Minimizing the use of potable makeup water for non-potable uses. 6. Minimizing building operations disruptions during construction of the project.

Conceptual

Water / Sewer

$25,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
215
Bidding Soon
3,171
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2026

Project location map

525 Golden Gate Ave, San Francisco, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.