Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 9, 2025 at 7:00 PM
Updated December 10, 2025
Site work for a water / sewer project in San Francisco, California. Completed plans call for site work for a water / sewer project.
The San Francisco Public Utilities Commission (SFPUC) is issuing this Request for Qualifications (RFQ) in search of Applicants with the specified qualifications to respond to the forthcoming Request for Proposals (RFP) to design and construct the DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers Rehabilitation project (Project). An "Applicant" is any entity responding to this RFQ. Built in 1952, the Southeast Water Pollution Control Plant (SEP) is the City's largest wastewater treatment facility, handling nearly 80% of San Francisco's combined stormwater and wastewater every year. The purpose of the SEP secondary clarifiers (SEP 230) is to separate the activated sludge in the mixed liquor from the treated wastewater. Return activated sludge is returned to the aeration tanks and waste activated sludge is transferred to the solids handling facilities. The sedimentation tanks consist of sixteen reinforced concrete circular tanks which are divided into two groups of eight, designated as the North and South clarifiers by their relative position on the plant site. Equipment included in SEP 230 includes diffusers to mix the flow in the mixed liquor channels, gates and valves to control flow and sludge/scum collection equipment in the clarifiers. A condition assessment study of SEP was implemented between 2012 and 2013, which identified structural deficiencies and needs for equipment replacement. The SEP condition assessment identified that structural rehabilitation of the clarifiers is needed. The clarifiers were found to be corroded and failure of existing clarifier related components had contributed to numerous and repeated temporary repairs and extended clarifier downtime. Through the CWWSIPSE04/WW-626 Primary & Secondary Clarifier Upgrades Project, SFPUC completed concrete spall repair, secondary clarifier mechanism replacement, and clarifier concrete coating for eight of the sixteen tanks as part of a phased implementation approach. To meet Operational Reliability (State of Good Repair) level of service goals, this project addresses rehabilitation works for the remaining eight tanks. All requests for information concerning the RFQ must be directed to qbd@sfwater.org no later than the Deadline for Applicants to Submit RFQ Questions. Question Deadline 10/29/2025
Post-Bid
Water / Sewer
$44,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
