BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Site work for a water / sewer project in San Francisco, California. Completed plans call for site work for a water / sewer project.

The San Francisco Public Utilities Commission (SFPUC) is issuing this Request for Qualifications (RFQ) in search of Applicants with the specified qualifications to respond to the forthcoming Request for Proposals (RFP) to design and construct the DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers Rehabilitation project (Project). An "Applicant" is any entity responding to this RFQ. Built in 1952, the Southeast Water Pollution Control Plant (SEP) is the City's largest wastewater treatment facility, handling nearly 80% of San Francisco's combined stormwater and wastewater every year. The purpose of the SEP secondary clarifiers (SEP 230) is to separate the activated sludge in the mixed liquor from the treated wastewater. Return activated sludge is returned to the aeration tanks and waste activated sludge is transferred to the solids handling facilities. The sedimentation tanks consist of sixteen reinforced concrete circular tanks which are divided into two groups of eight, designated as the North and South clarifiers by their relative position on the plant site. Equipment included in SEP 230 includes diffusers to mix the flow in the mixed liquor channels, gates and valves to control flow and sludge/scum collection equipment in the clarifiers. A condition assessment study of SEP was implemented between 2012 and 2013, which identified structural deficiencies and needs for equipment replacement. The SEP condition assessment identified that structural rehabilitation of the clarifiers is needed. The clarifiers were found to be corroded and failure of existing clarifier related components had contributed to numerous and repeated temporary repairs and extended clarifier downtime. Through the CWWSIPSE04/WW-626 Primary & Secondary Clarifier Upgrades Project, SFPUC completed concrete spall repair, secondary clarifier mechanism replacement, and clarifier concrete coating for eight of the sixteen tanks as part of a phased implementation approach. To meet Operational Reliability (State of Good Repair) level of service goals, this project addresses rehabilitation works for the remaining eight tanks. All requests for information concerning the RFQ must be directed to qbd@sfwater.org no later than the Deadline for Applicants to Submit RFQ Questions. Question Deadline 10/29/2025

Post-Bid

Water / Sewer

$44,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

July 13, 2026

Project location map

To be determined, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.