Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 5, 2025 at 7:00 PM

Updated November 6, 2025

Site work and new construction of a parking garage in Glenwood Springs, Colorado. Completed plans call for the construction of a parking garage; and for site work for a parking garage.

Reference Number 0000400015 Colorado Mountain College's Facilities Department is requesting quotes from qualified firms and/or individuals to design and build bike storage facilities for the Spring Valley and Breckenridge Campuses for residents of student housing. The specifications below are for each site. CMC will need this structure completed for the Spring Valley and Breckenridge campuses and completed by December 1, 2025. Additional structures may be requested in the Spring of 2026 for the CMC Edwards campus. Target Award Date (Subject to Change) OCTOBER 8, 2025 4:00 p.m. The specifications below are for each site. CMC will need this structure completed for the Spring Valley and Breckenridge campuses and completed by December 1, 2025. Additional structures may be requested in the Spring of 2026 for the CMC Edwards campus. Two Welded Structures 10' X 12' each. Front roof height is 9' X 7" tall back roof height is 7' X 7". 2" Steel Frame Material. Each structure will have Five Stud frames on 3" center lay out and Five Roof Rafters on 3 " centers. Wall Sections will have Three runs of 2" steel. One at bottom, One 30" up from bottom, and One at 7' X 7". Structure framing is to receive metal pro panel sheeting for Roof and outside walls. This will be performed by others. Provide one Door. 4' X 4'. 2" steel frame with 1/4" perforated welded steel. Weld 6" X 6" 1/4" steel tabs in four inside corners 5/8" hole so units can be wedge bolted down. Structures will be placed on a 12' X 26' concrete pad. Primed and finished paint gloss black. Question Deadline 10/02/2025 at 2:00 PM MT Questions are submitted online No, Questions regarding this RFP should be submitted via email to bids@coloradomtn.edu. CMC will attempt to answer all relevant questions submitted to this email address prior to the question deadline in the timeline above. All such addenda issued by CMC prior to the time that proposals are received shall be considered part of the RFP.

Award

Parking Garage

$50,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
14
Bidding Soon
294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

February 6, 2026

Project location map

Multiple Locations, Glenwood Springs, CO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed