Published November 21, 2025 at 7:00 PM

Updated November 22, 2025

Site work for a water / sewer project in Verona, Virginia. Completed plans call for site work for a water / sewer project.

Scope of Work: 1. Furnish all labor, materials, equipment, permits, and supervision necessary for the trenchless pipe rehabilitation of 8,867.9 linear feet of 8", 806.5 linear feet of 12", and 125.0 linear feet of 15" sanitary sewer main utilizing cured in place pipe (CIPP) or an acceptable alternative approved by OWNER. Total footage to be lined is 9,799.4 linear feet with 103 lateral reinstatements. 2. Additionally, the Bidder must furnish all labor, materials, equipment, permits, and supervision necessary for the rehabilitation of 75 manholes totaling 544.6 vertical feet. 3. All work is located in Augusta County. The Bidder shall adhere to all requirements specified in the following attachments. The Bidder shall restore any disturbed land and roadways to AW and VDOT standards at no additional cost to the OWNER. No trash shall ever be stored at the site and the Bidder shall consult with OWNER about acceptable locations to store materials, equipment, and vehicles overnight and on weekends. 4. All access and manhole locations issues will be coordinated and resolved by AW. Fire hydrants will be available at no charge to the bidder, however proper backflow prevention will be enforced. 5. The Bidder must be able to mobilize within 2 months of Notice of Award. 6. It is expected the Bidder work continuously on this project, not including weekends and holidays, from start until finish without any delays except as approved by OWNER. Failure to work continuously without delays except as acceptable to the OWNER can result in loss of compensation at the rate of $1,000 per work day until the Bidder resumes work. 7. The contract time for the work to be complete shall be 180 consecutive working days from mobilization. Failure to complete the work within the timeframe can result in loss of compensation at the rate of $500 per work day. Allowances for weather and other delays will be at the sole discretion of the OWNER. 8. Attached maps give an overview of the project area. 9. The following tables give an overview of the pipe and manhole characteristics. All measurements must be verified by Bidder Question Deadline 10/16/2025 at 2:00 PM ET Technical Questions: Jesse Roach, Director of Field Operations Phone: 540-490-2423 Email: jroach@augustawater.com No pre-bid meeting currently scheduled. The contract time for the work to be complete shall be 180 consecutive working days from mobilization. Technical Questions: Jesse Roach, Director of Field Operations Phone: 540-490-2423 Email: jroach@augustawater.com

Award

Water / Sewer

$778,218.00

Public - County

Site Work

25

6

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
6
Bidding Soon
519
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

December 1, 2025

Project location map

Multiple Locations, Verona, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.