Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 30, 2025 at 8:00 PM
Updated October 31, 2025
Site work and paving for a bridge / tunnel in Milton, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Document info: . Contact the Engineer, Larson Design Group, 1000 Commerce Park Drive, Suite 201, Williamsport, PA 17701; 570-323-6603 between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday, with any questions pertaining to access and use of the website. The deadline for submitting questions is 72 hours before the let date and time. Each BID must be accompanied by a Bid Bond payable to the Owner for ten percent (10%) of the total amount of the BID. As soon as the BID prices have been compared, the Owner will return the Bonds of all except the three lowest responsible bidders. When the Agreement is executed, the bonds of the two remaining unsuccessful bidders will be returned. Bidders must submit with their initial bid, a statement as to whether they have previously performed work subject to the Presidents Executive Order No. 11246 (30 F.R. 12319-25) Equal Opportunity Clause. The Bidder acknowledges that this bid is for a public works contract and bidder is therefore subject to the provisions, duties, obligations and penalties of the Public Works Employment Verification Act, 43 P.S. 167.1 - 167.11, which is incorporated herein by reference. The Owner reserves the right to reject any or all bids, to waive any informalities in the bidding, or to limit the scope of work involved. No bidder may withdraw a bid within sixty (60) days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder. Pennsylvania Department of Transportation prequalification is not required for this contract; however, contractor should be able to provide proof of prior experience. Prevailing wage rates are required for this contract. Question Deadline 10/10/2025 All requests for information or document clarifications during the bid process shall be emailed through the website
Bid Results
Bridges / Tunnels
$156,120.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2025
October 24, 2025
Keefer Mill Rd, Milton, PA
Related To This Project
Milton, PA
Bid Date: Oct 27 2025
Milton, PA
Bid Date: Oct 27 2025
Milton, PA
Bid Date: Nov 03 2025
Milton, PA
Bid Date: Aug 20 2025
Milton, PA
Bid Date: Aug 11 2025
Milton, PA
--
Milton, PA
Bid Date: Jun 11 2025
Milton, PA
Bid Date: May 05 2025
Milton, PA
Bid Date: Apr 23 2025
Milton, PA
Bid Date: May 02 2025
Milton, PA
Bid Date: Apr 02 2025
Milton, PA
Bid Date: Mar 20 2025
Milton, PA
Bid Date: Jan 06 2025
Milton, PA
Bid Date: Nov 12 2024
Milton, PA
Bid Date: Nov 26 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.