BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Site work and paving for a bridge / tunnel in Milton, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Document info: . Contact the Engineer, Larson Design Group, 1000 Commerce Park Drive, Suite 201, Williamsport, PA 17701; 570-323-6603 between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday, with any questions pertaining to access and use of the website. The deadline for submitting questions is 72 hours before the let date and time. Each BID must be accompanied by a Bid Bond payable to the Owner for ten percent (10%) of the total amount of the BID. As soon as the BID prices have been compared, the Owner will return the Bonds of all except the three lowest responsible bidders. When the Agreement is executed, the bonds of the two remaining unsuccessful bidders will be returned. Bidders must submit with their initial bid, a statement as to whether they have previously performed work subject to the Presidents Executive Order No. 11246 (30 F.R. 12319-25) Equal Opportunity Clause. The Bidder acknowledges that this bid is for a public works contract and bidder is therefore subject to the provisions, duties, obligations and penalties of the Public Works Employment Verification Act, 43 P.S. 167.1 - 167.11, which is incorporated herein by reference. The Owner reserves the right to reject any or all bids, to waive any informalities in the bidding, or to limit the scope of work involved. No bidder may withdraw a bid within sixty (60) days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder. Pennsylvania Department of Transportation prequalification is not required for this contract; however, contractor should be able to provide proof of prior experience. Prevailing wage rates are required for this contract. Question Deadline 10/10/2025 All requests for information or document clarifications during the bid process shall be emailed through the website

Bid Results

Bridges / Tunnels

$156,120.00

Public - County

Paving, Site Work

12

9

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
166
Bidding Soon
1,874
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

October 24, 2025

Project location map

Keefer Mill Rd, Milton, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.