Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 6, 2026 at 8:00 PM

Updated October 12, 2026

Site work and paving for a mixed-use development in Issaquah, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City Assumes No Obligations, Responsibilities and Liabilities, Fiscal or Otherwise, to Reimburse All or Part of the Costs Incurred by the Parties Responding to This RFQ. The City Reserves the Right to Modify or Cancel in Part, or in Its Entirety, This RFQ. Project Descriptions the Nw Juniper Street Improvements Installs Shared-Use Path Improvements Including Pedestrian Lighting, Striping, Signing, Driveway Aprons, and Ada Ramps at One Location. The Project Limits Span From Newport Way Nw to 800ft to the East, Which Lies Approximately 150ft East of the 7th Ave Nw Intersection. This Project Will Tie Into the Existing Shared Use Path on Juniper Street and Complete It to the Intersection of Newport Way Nw. Scope of Work the Anticipated Scope of Work for the Selected Consultant Includes, but Is Not Limited to, the Following: Provide Project Administration and Coordinate With Subconsultants, Complete and Provide a Survey Basemap of Each Project Site Including Utility Locates, Provide Transportation Engineering Support (Including but Not Limited to Lighting, Parking Lot Design, Drainage, Bioretention Design, Turn Template, Safety Analysis), Nepa Support, and Other Services May Be Requested (Review of Design, Other Transportation Engineering Support as Needed), Coordinate With Existing Utilities to Mitigate Conflicts and Complete Utility Potholing. Evaluation Criteria Submittals Will Be Evaluated and Ranked Based on the Following Criteria: 1. Company Experience, Past Performance and Qualifications 2. Key Personnel, In-House Expertise and Ability to Meet Schedule (Complete for Consultant and Subconsultants) 3. Project Understanding and Scope of Work 4. Familiarity With Wsdot/Fhwa Standards Sbe Goal in the Absence of a Mandatory Dbe Goal, a Voluntary Sbe Goal Amount of Ten Percent of the Consultant Agreement Is Established. The method of Contractor Selection has not been Determined at this time. The Consultant Shall Develop a Sbe Participation Plan Prior to Commencing Work. Although the Goal Is Voluntary, the Outreach Efforts to Provide Sbe Maximum Practicable Opportunities Are Not. Questions Can Be Directed to Caleb Trapp at Caleb.trapp@issaquahwa.gov.

Conceptual

Roads / Highways

$1,875,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
105
Bidding Soon
2,131
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed