BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Site work for a water / sewer project in Pontiac, Michigan. Completed plans call for site work for a water / sewer project.

The following Specifications for Contract Work, as included, set forth conditions or requirements particular to the Work to be performed under this Contract. The Work to be performed shall be as described in these specifications. The method of measurement and basis of payment for Work performed shall be as indicated in the Measurement and Payment (01 22 00) and described in the following divisions. Under each item of Work listed in the Bid Form and herein described, the CONTRACTOR shall furnish: all labor and materials; tools, plant, equipment, supplies, and bonds; costs of heating, lighting, and power; tests of construction materials as required under any section of these Specifications; and all Work that may be specifically described and included in the following divisions (under the respective items, whether included in part of a pay item or otherwise specified) necessary to complete the Work in accordance with the obvious or expressed intent of the Contract. Reference Number 0000400043 This COSDS Area 2A Rehabilitation Design Build project includes the below general quantities. Refer to the attached drawings and specifications for project details and bid form for complete bid quantity. 13,872 linear feet of cured in-place pipe (CIPP) lining with either a non-styrenated resin or an encapsulated liner (approximately 30 pipe segments approximately 79 ft long to 1400 ft long, and 54-inch diameter) Manhole rehabilitation and spray applied lining of (30) 4 ft inner diameter manholes (approximate vertical depths between 20.1 ft to 50.6 ft) Bypass pumping required to isolate each pipe segment to be rehabilitated (3,200 to 8,800 gpm: bypass routes vary between 2,390 ft to 8,140 ft) Traffic control and maintenance for each lining and bypass pumping setup and various additional site preparation, site restoration, SESC controls, and all work within the sewer/manholes to install bypass pumping systems, CIPP liner and spray applied liners. Question Deadline 12/12/2025 at 5:00 PM ET Questions are submitted online Yes, Questions, comments, or concerns of any Bidder regarding bidding or the Contract Documents or the project, must be submitted in writing by No inquiry received less than 7 days prior to the date fixed for the opening of Bids will be given consideration. Submit all questions via online per the RFP submission section. Bonding Requirements - Bid Bond 5 % A certified cashier's check or bid bond for a sum not less than five percent (5%) of the amount of the proposal will be required for each proposal. Owner reserves the right to accept any proposal, to reject any proposal and to waive irregularities in the proposals.

Award

Water / Sewer

$22,477,790.00

Public - County

Site Work

62

28

14

8

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
3
Bidding Soon
1,595
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2026

December 7, 2026

Project location map

520 W Walton Blvd, Pontiac, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.