Published December 4, 2025 at 7:00 PM

Updated December 18, 2025

Site work and paving for a mixed-use development in Lynnwood, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Cost Estimate: $1,110,000 - $1,330,000 The Work Under This Contract is to Replace Existing Isolation Valves and Installing New Tees for Pipe Access on the Districts 24-inch and 30-inch Ductile Iron (Di) Potable Water Transmission Mains at Three (3) Separate Site Locations and Includes: Installation of One (1) 16-inch Butterfly Valve, One (1) 24-inch Butterfly Valve, Three (3) 30-inch District Supplied Butterfly Valves With Appurtenances. Installation of One (1) 30-inch by 16-inch Tee, Two (2) 30-inch by 24-inch Tees and One (1) Precast Concrete Access Vault With Appurtenances for Pipe Access. Removal and Replacement of Approximately 50 Linear Feet of 12-inch Diameter Di Water Main With 16-inch Diameter Water Main, Including Replacement of Two (2) 12-inch Diameter Gate Valves, Fittings, Appurtenances, and Installation Two (2) New 12-inch Insertion Valves at One Site Location. Removal and Replacement of Impacted Storm Drain at Site 3-06b. Removal, Hauling, and Disposal of Existing Transmission Main Piping, Water Main Piping, Valves, Appurtenances. Roadway and Property Restoration, Site Cleanup, and Temporary Traffic Control. The Project is Located at Three (3) Different Sites Within Snohomish County and Washington State Department of Transportation (Wsdot) Right-of-way and Easements Within Private Property Along the Interurban Trail. Substantial Completion of Sites 3-04, 3-06a and 3-06b Shall Be Completed No Later Than May 15, 2026. Restoration Associated With the Project Includes, but is Not Limited to, Temporary and Permanent Trench Patching, Grind and Overlay, Reconstruction of Localized Curb, Gutter, Sidewalk, and Driveway Approach, Repaving Disturbed or Damaged Pedestrian Trail, and Landscaping for Areas Disturbed During Construction. Restoration Requirements Must Meet Requirements of the Jurisdiction Having Authority, Including Snohomish County and Wsdot. The District Further Reserves the Right, but Without Obligation, to Waive Informalities and Irregularities. No Bid Will Be Considered Unless Accompanied by a Bid Guaranty (Certified or Cashier's Check, Surety Bond, or Postal Money Order) Payable to Alderwood Water & Wastewater District in an Amount Not Less Than Five Percent (5%) of the Total Bid Price. Work Categories: Earthwork (Excavation, Shoring, Dewatering), Mechanical (Piping, Valves), Structural (Manholes, Vaults, Falsework, Etc.), Paving, and Surface Restoration. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$718,900.00

Public - City

Paving, Site Work

21

26

2

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
53
Bidding Soon
1,798
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

February 2, 2026

Project location map

Multiple Locations, Lynnwood, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.