BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 24, 2026 at 7:00 PM

Updated February 25, 2026

Site work and paving for a mixed-use development in Kent, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Interest From Professional Consulting Firms With Expertise in Administration and Management of Federally Funded Public Works Construction Projects. This Agreement Will Be a Negotiated Hourly Rate Contract and is Expected to Be Awarded in April 2026 and Will Be Approximately 130 Working Days in Duration With the Option for the City of Kent to Extend It for Additional Time and Money if Necessary. Consultants Will Be Considered for the Following Project. 64th Avenue South and South James Street Pavement Preservation City Project No.: 24-3005 Federal-aid No.: Nhpp-0017(051) the City of Kent Reserves the Right to Amend Terms of This "request for Qualifications" (Rfq) to Circulate Various Addenda, or to Withdraw the Rfq at Any Time, Regardless of How Much Time and Effort Consultants Have Spent on Their Responses. Project Description the Work to Be Performed by the Consultant Consists of the Following: Thoroughly Record and Track All Federal Funding Documentation Requirements as Outlined in Wsdot's Local Agency Guidelines Manual During Construction; Materials Sampling, Specialty Inspections, Testing and Reporting Service; Geotechnical Monitoring, Inspection and Reporting Service; Overall Site Inspection Including Thorough Record Keeping Related to Contractor Progress and Activity; Photo and Video Documentation of All Existing Surrounding Property Conditions Including Structures, Current Landscape Conditions, and Other Pre-existing Improvement Conditions Within and Around the Project Site. the Proposed Construction Project Consists of Pavement Preservation and Related Activities on 64th Avenue South and South James Street. This Work Will Include Full Width Overlays Along 64th Avenue From Meeker Street to James Street and on James Street From 64th Avenue to Washington Avenue. There Will Full Depth Pavement Repair at Several Locations Where the Existing Pavement Section is in an Advanced State of Deterioration. This Work Will Also Include Several Water System Improvements in the Vicinity of Smith Street, James Court, and the Installation of New Run of 12-inch Water Main Along James Street. All in Accordance With the Attached Contract Plans, These Contract Provisions, and the Standard Specifications. The Project Has a Mandatory 10% Fsbe Goal During Construction, a 0% Fsbe Goal for Consultant Services Contracts, and a Voluntary 10% Sbe Goal. The Major Features of the Project Are as Follows: Removal of Approximately 3,250 Sy of Existing Asphalt Pavement and Concrete Sidewalk. Planing Approximately 19,200 Sy of Existing Asphalt. Paving Approximately 4,000 Tons of Hot Mix Asphalt. 900 Lf of Cip Concrete Curb. 130 Sy of Concrete Sidewalk. 670 Lf of New 8" and 12" Diameter Restrained Joint Ductile Iron Water Main. 24 Ea 6' Diameter Traffic Loops. 22,000 Lf of Permanent Channelization With 76 Ea Symbols and 1,100 Sf of Plastic Crosswalk Line the Construction is Expected to Begin in Spring 2026. There Are 100 Working Days. The method of Contractor Selection has not been Determined at this time. the City of Kent Reserves the Right to Retain the Services of the Successful Firm(S) for Any Subsequent Phases Associated With This Project.

Conceptual

Roads / Highways

$3,070,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
126
Bidding Soon
1,834
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.