BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated December 2, 2025

Renovation of a water / sewer project in Carrollton, Virginia. Completed plans call for the renovation of a water / sewer project.

Isle of Wight County is soliciting sealed proposals from qualified firms to establish a contract through competitive negotiations for Pump Station #38 Pump Equipment Removal. Background Pump Station 38 is an existing wet well / dry well Pump Station located Isle of Wight County in the Carrollton area adjacent to Route 17. Currently 1 of the 2 Pumps has failed and needs replacement. Due to the design of the existing structure, there is not an adequate system in place for removal of the Pump. Load testing was conducted in 2025 on the slab in anticipation of this project. To allow for future removal of either pump, the rigging, structures, and hoists used for this task will remain in place for future use by Isle of Wight County Utilities Services Department. In preparation for the work of this project, Initial loading testing of structural members was contacted in 2025 and is included in the supporting documentation. Question Submission Deadline: October 29, 2025, 1:00pm All questions and/or comments should be submitted through the Procurement Portal. The respondents to this IFB shall not contact, either directly or indirectly, any other employee or agent of the County regarding this IFB. Any such unauthorized contact may disqualify the offeror from procurement. The contractor will evaluate the structure of PS 28 and based upon that professional analysis install the necessary rigging and hoists to remove one of the existing pumps and place it on the platform outside the building. The rigging and hoist will remain in place and become the property of Isle of Wight County for its future use in maintaining the pump station. Bid Bonds will not be required for this solicitation. The Contractor shall provide all labor, equipment, rigging, hoists, and incidental materials necessary to safely remove the existing pump and place it in the designated location outside the structure. As part of this work, the Contractor shall furnish and install any temporary or permanent rigging, hoists, supports, or related equipment required to complete the pump removal. All installed rigging and hoists shall remain in place and become the property of the County for future use in pump reinstallation or removal. All work shall be performed in a manner that maintains safe operations and continued accessibility for County staff

Award

Water / Sewer

$62,000.00

Public - County

Renovation

6

11

15

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
74
Bidding Soon
1,303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

January 12, 2026

Project location map

22460 Harbor Towne Dr, Carrollton, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.