BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2025 at 7:00 PM

Updated December 16, 2025

Site work and renovation of a civil project in Littleton, Colorado. Completed plans call for site work for a water / sewer project; and water / sewer project.

The Work consists of construction of replacement of surge anticipator valves at the East Cherry Valley Water and Sanitation District, Western Booster Pump Station. Demolition of two surge anticipator angle valves, one pump control valve, electrical control panels, and associated piping, conduit, and wiring. Installation of two new globe surge anticipator valves, including piping, fittings, instrumentation, pipe supports, and appurtenances for fully functional surge control systems. Installation of a new pump discharge check valve and associated piping. Electrical and control improvements including new control panels, ethernet cabling, conduit, and network racks. Repair and reconstruction of existing facilities affected by the Work, and incidentals for complete and usable facility. The Bidder to whom a contract is awarded will be required to furnish "Performance and Maintenance" and "Labor and Material Payment" bonds to the District. The "Performance and Maintenance" and "Labor and Material Payment" bonds shall be furnished in the amount of 100 percent of the contract, in conformity with the requirements of the Contract Documents The District reserves the right to reject any and all proposals, or to accept that proposal or combination of proposals, if any, which in its sole and absolute judgment, will, under all circumstances, best serve the District's interest. No proposal will be accepted from any firm, person, or corporation, who is a defaulter as to surety or otherwise, or is deemed incompetent, irresponsible, or unreliable by the District Board of Directors. Est. Completion Date: April 30, 2026 Question Deadline Oct 27, 2025 5pm All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents.

Award

Water / Sewer

$578,749.00

Public - County

Renovation, Site Work

27

17

5

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
52
Bidding Soon
1,283
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2025

December 1, 2025

Project location map

6875 Business Center Dr, Littleton, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.