Published January 14, 2026 at 7:00 PM
Updated January 15, 2026
Site work, paving and new construction of a mixed-use development in Austin, Texas. Completed plans call for the construction of a 15,174-square-foot, three-story above grade fire / police facility; for site work for a fire / police facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
**As of January 14, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** The project includes, but is not limited to, the construction of a new fire station facility of approximately 15,174 square feet, including associated site work, utilities, concrete paving, masonry, structural steel, roofing, mechanical, electrical, plumbing, fire protection, and all other work shown in the construction documents All questions during the bidding process are to be submitted in writing to: i) Erin Brown ii) ebrown@brwarch.com Last day for bidder questions: 3:00PM CST, Wednesday, December 3, 2025 To construct a new, fully operational 3-story fire station to enhance emergency response capabilities. The facility will accommodate fire personnel, apparatus, and support functions, while meeting all applicable code, safety, and operational requirements. The facility consists of 15,175 SF combined with the lower public level with lobby and training room; the main level spaces with Apparatus Bays (3), decontamination areas, gear storage, offices, dayroom, kitchen, fitness room; and the third level of sleeping rooms, bathrooms, storage and mechanical equipment. Site development to include site clearing, grading, and preparation. Relocation of existing utilities serving existing buildings within the site. Installation of underground utilities (water, sewer/ septic, electric, gas, data). Construction of a new access driveway, apparatus aprons, parking areas, sidewalks, stormwater treatment, stormwater detention, and landscaping. Building construction to include stiffened slab on grade, structural steel framing, CMU framing, masonry veneer & metal panel, light gauge & CMU interior partitions, metal roof, covered porch and roof top deck. Elevator installation and code-compliant stairwells. Installation of energy-efficient HVAC systems. Full electrical system, including lighting, back-up generator, and emergency power. Potable water, wastewater, and fire suppression systems. Compliance with NFPA and local fire/ life safety codes. Communications and technology with structured cabling for data/ voice systems. Integration of emergency dispatch systems and security system including access control. Testing, commissioning, and closeout including full testing of building systems and infrastructure. Training for facility staff on building operations and safety systems. Final inspections, occupancy certifications, and closeout documentation. The estimated budget for this project is $10,500,000 This project includes construction of a new 15,175 SF, three-story fire station designed to support full emergency operations and modern fire service needs. i) Major building elements include a stiffened slab foundation, structural steel framing, CMU walls, masonry veneer, metal wall panels, standing-seam metal roofing, and a rooftop deck. ii) Interior spaces include three apparatus bays with decontamination and gear areas, offices, kitchen, dayroom, training room, fitness area, and upper-level sleeping quarters. iii) Site development involves grading, utility relocations, new underground utilities, concrete aprons and driveways, parking, stormwater treatment & detention, and landscaping. iv) The project also includes an elevator, emergency generator, HVAC, communications, security, and station alerting systems, with full testing, commissioning, and staff training prior to occupancy pn-104576-00004, 24-0730 The address for delivery is: Attention: David Wilson, Fire Chief Travis County Emergency Services District No. 9 1301 S. Capital of Texas HWY, Building B, Suites 123 West Lake Hills, TX 78746 Question Deadline 12/03/2025 at 3:00 PM CT
Bid Results
Fire / Police
$11,142,777.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2025
March 16, 2026
7701 Bee Caves Rd, Austin, TX
Related To This Project
Austin, TX
Bid Date: Nov 06 2025
Austin, TX
Bid Date: Nov 13 2025
Austin, TX
Bid Date: Oct 28 2025
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Nov 20 2025
Austin, TX
Bid Date: Oct 24 2025
Austin, TX
Bid Date: Oct 30 2025
Austin, TX
Bid Date: Oct 31 2025
Austin, TX
Bid Date: Jan 31 2026
Austin, TX
Bid Date: Nov 12 2025
Austin, TX
Bid Date: Oct 10 2025
Austin, TX
--
Austin, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.