Site work for an educational facility in Redlands, California. Completed plans call for site work for a one-story above grade educational facility.
The work involves the gas line lateral installation and connection at Redlands High School. Bids must be submitted with the proper bid title and number. A mandatory job walk is required. A California type A or B license or equivalent is required, as well as current registration with the CA Department of Industrial Relations. Contractors and any subcontractors must pay prevailing wages as specified. The District seeks DVBE participation. The Board reserves the right to accept or reject any bids, waive irregularities, and act as sole judge regarding merit, quality, and compliance with plans and specifications. Any questions regarding the bid specifications shall be submitted to Purchasing in writing by October 30th, 2025 by 4:00 pm by email to amy_drummond@redlands.k12.ca.us Please verify receipt of question if emailing. Questions must be submitted prior to bid opening as specified at job walk SCOPE OF WORK Provide USA for any underground work being performed. Sawcut existing concrete and asphalt, excavate trench and haul off concrete, asphalt and soils. Install approx. 350 LF of 3" Poly gas main line from 3" lateral valve at main line by the Kitchen to gas connection location at the library. A new gas valve is to be installed at connection location. Install approx. 250 LF of 2" Poly gas main line from 2" lateral valve at main line by Kitchen to the rear of the Administration building. Install sand bedding and shading, Back fill with class 2 base rock. Form and pour new concrete flatwork following existing sheeting and V drain design, doweled every 18", with broom finish and new asphalt paving. Work will need to be performed on a flexible schedule to not interfere with school functions and student activity. Student and staff path of travel is to be considered throughout the project. Temp fencing and trench covering will need to be utilized for student and staff safety.
Bid Results
Educational
$178,507.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 5, 2025
December 4, 2025
840 E Citrus Ave, Redlands, CA
Related To This Project
Redlands, CA
Bid Date: Oct 28 2025
Redlands, CA
Bid Date: Nov 13 2025
Redlands, CA
Bid Date: Nov 05 2025
Redlands, CA
Bid Date: Nov 19 2025
Redlands, CA
Bid Date: Dec 09 2025
Redlands, CA
Bid Date: Dec 03 2025
Redlands, CA
--
Redlands, CA
Bid Date: Nov 19 2025
Redlands, CA
Bid Date: Oct 22 2025
Redlands, CA
--
Redlands, CA
--
Redlands, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.