Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work for an educational facility in Redlands, California. Completed plans call for site work for a one-story above grade educational facility.

The work involves the gas line lateral installation and connection at Redlands High School. Bids must be submitted with the proper bid title and number. A mandatory job walk is required. A California type A or B license or equivalent is required, as well as current registration with the CA Department of Industrial Relations. Contractors and any subcontractors must pay prevailing wages as specified. The District seeks DVBE participation. The Board reserves the right to accept or reject any bids, waive irregularities, and act as sole judge regarding merit, quality, and compliance with plans and specifications. Any questions regarding the bid specifications shall be submitted to Purchasing in writing by October 30th, 2025 by 4:00 pm by email to amy_drummond@redlands.k12.ca.us Please verify receipt of question if emailing. Questions must be submitted prior to bid opening as specified at job walk SCOPE OF WORK Provide USA for any underground work being performed. Sawcut existing concrete and asphalt, excavate trench and haul off concrete, asphalt and soils. Install approx. 350 LF of 3" Poly gas main line from 3" lateral valve at main line by the Kitchen to gas connection location at the library. A new gas valve is to be installed at connection location. Install approx. 250 LF of 2" Poly gas main line from 2" lateral valve at main line by Kitchen to the rear of the Administration building. Install sand bedding and shading, Back fill with class 2 base rock. Form and pour new concrete flatwork following existing sheeting and V drain design, doweled every 18", with broom finish and new asphalt paving. Work will need to be performed on a flexible schedule to not interfere with school functions and student activity. Student and staff path of travel is to be considered throughout the project. Temp fencing and trench covering will need to be utilized for student and staff safety.

Bid Results

Educational

$178,507.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
19
Bidding Soon
2,141
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

December 4, 2025

Project location map

840 E Citrus Ave, Redlands, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.