BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 22, 2025 at 8:00 PM

Updated October 23, 2025

Site work and paving for a mixed-use development in Gaithersburg, Maryland. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; transportation facility; and transportation facility.

The City of Gaithersburg invites qualified engineering consulting firms to submit a proposal to provide professional Engineering, Surveying and Subsurface Utility Engineering (SUE) Services to improve pedestrian safety in the area especially for pedestrians to and from the train station. Consultants are urged to submit concise proposals, appropriate to scale of the project and include only items that are relevant to this specific project. The cost proposal shall be submitted following instructions further in this solicitation. As part of this improvement, the City is seeking design of an ADA compliant traffic signal at S. Summit Avenue and Olde Towne Avenue. In addition, the City is seeking to improve pedestrian crossing before and after the CSX train tracks on S. Summit Avenue with improved pedestrian signal crossing(s). The following are items that the City wants to be included for the design: Corridor pedestrian safety improvements Sidewalk improvements; Mid-block crossings; Driveway entrance reviews/design; City owned entrance access reviews; Signage and marking; Signal timing and signal gaps for pedestrians; Leading pedestrian intervals; Signal coordination and timing with train track preemption; Roadway geometry and surveying; Montgomery County Coordination for the traffic signal operation; Subsurface utility engineering; Traffic signal improvements; Utility test pitting, utility coordination, and boundary information; Prepare plats/exhibits and descriptions; and Perform land acquisition services. The intersection of S. Summit Avenue and Olde Towne Avenue is a four-legged intersection with free flowing along S. Summit Avenue with two lanes northbound and two lanes southbound; the west leg of Olde Towne Avenue is a STOP controlled approach with left turn only and right turn only lanes, there is no thru movement indicated. The east leg is a one lane, one way street which is an entrance to the Gaithersburg Post Office. Currently there is a Rapid Rectangular Flashing Beacons (RRFB) installed south of the CSX tracks on S. Summit Avenue that the City is interested in determining if alternative signal improvement associated with the signal at S. Summit and E. Diamond Avenue can help create an improved crossing. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$426,500.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
450
Active Projects
222
Bidding Soon
3,379
All Active Projects
1,303
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2026

Project location map

S Summit Ave & Olde Towne Ave, Gaithersburg, MD

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.