BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Site work for a water / sewer project in Kaufman, Texas. Completed plans call for site work for a water / sewer project.

Utility Improvements for Cartwright Mays, Phase 3A and CR 261 - Present plans provide for the construction of single-family, residential structures. The proposed residences are anticipated to create light loads to be carried by the foundations. We expect the residences will be supported using slab-on-grade foundation systems designed for soil-related potential movements of 4 1/2 inches. No below-grade slabs are planned. The Developer, CMDev Land, LLC., will be the Payor for the contract for the Owner. Bid security in the form of bid bond or cashier's check payable to CMDev Land, LLC. on behalf of Kaufman County Fresh Water Supply District No. 7A in an amount not less than five percent (5%) of the Bid submitted, must accompany each Bid. Question Deadline 10/16/2025 All questions about the meaning or intent of the Bidding Documents are to be directed to ENGINEER. Questions received less than three working days prior to the date for opening of Bids may not be answered. Project Location. The project is located off County Road 261 at the proposed Rockford Street in Kaufman County, Texas. The general location and orientation of the site is provided in Appendix A. A. Parts of the Work must be substantially completed on or before the following Milestone(s): 1. Milestone 1 (Substantial Completion) o Water pipe, service lines, fire hydrants o Sanitary sewer pipe, service lines, manholes o Storm sewer pipe, laterals and inlets o Streets back to design grade 2. Milestone 2 (Final Completion) o Outfall erosion control (rock rip rap) o Inlet tops o Water meter boxes o Valve and manhole adjustments o paint fire hydrants o fire hydrant roadway marker buttons o fire hydrant and water valve splash pads o clean manholes and wipe all manhole joints o clean inlets o remove silt from storm sewer outfalls o provide final TV testing of sanitary sewer lines and storm lines (if required) prior to final walk o General clean up

Award

Water / Sewer

$2,701,860.00

Public - County

Site Work

32

15

76

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
407
Active Projects
147
Bidding Soon
4,149
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

November 20, 2025

Project location map

Multiple Locations, Kaufman, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.