BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2026 at 8:00 PM

Updated May 22, 2026

Site work for a playground / park / athletic field in Pensacola, Florida. Completed plans call for site work for a playground / park / athletic field.

Wayside Park East and 17th Avenue Park Improvements The City Shall Have the Authority to Reject All Responses and Advertise for New Responses. Any questions concerning the bid should include the Subject Line: BID # - RFI, and should be addressed and submitted in writing no later than 10:00 A.M., local time, May 8, 2026, to: Dedria Lunderman, Purchasing Manager City of Pensacola 222 W. Main St. Pensacola, FL 32502 purchasing@cityofpensacola.com Wayside Park East at 17th Avenue and Bayfront Parkway has fallen into disrepair due to its age, and this was made far worse by hurricane damage. The park's boat ramps, and dock were damaged during Hurricane Sally, the parking lot pavement is in poor condition and lacks current accessibility features, and the boardwalk north of the railroad track needs replacement. Additionally, the northbound approach to "Graffiti Bridge" is notorious for generating truck strikes on the low bridge. This project works in conjunction with FDOT to install a state-of-the-art advanced warning system alerting truck drivers of the low bridge hazard well before the bridge. Overall, road and park safety and accessibility are greatly improved by the successful completion of this project. project. BASE BID - BOAT RAMP, PARKING LOT, PEDESTRIAN PATHWAY The main goal of this project is to improve the parking lot and boat facilities at Wayside Park East. This includes the removal and demolition activities related to the existing pavement. This also includes the stabilization of the shoreline, erosion and sedimentation control, preparation of subgrade, base, asphalt and concrete pavement for the new parking lot and sidewalks. Additionally, the existing boat ramp is dilapidated and shall be restored to a new condition. This includes the addition of accessible pathways and parking to provide access for all mobilities. All pavement markings and striping shall be thermoplastic and shall be placed as called for in the plans and specifications. Generally, dewatering, sediment and erosion control, sod work and maintenance of traffic is to be expected

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Site Work

33

12

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
40
Bidding Soon
738
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2026

June 22, 2026

Project location map

Multiple Locations, Pensacola, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.