BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2026 at 7:00 PM

Updated February 26, 2026

Site work and new construction of a mixed-use development in North Syracuse, New York. Completed plans call for the construction of a 2,964-square-foot, one-story above grade service station / car wash facility; for site work for a service station / car wash facility; transportation facility; and transportation facility.

**As of February 25th, 2026 this project has been awarded to LeChase Construction Services.** Consolidated Rental Car Facility and Switchgear Building Construction Question Deadline 11/21/2025 Any questions, requests for information or clarification regarding this RFP should be submitted via email to bids@syrairport.org iNTENT AND PURPOSE OF THIS RFP The intent and purpose of this Request for Proposals (the "RFP") is to solicit responses for the selection of a firm to construct a covered 236,000 sq ft. consolidated rental car facility (ConRAC) with approximately 740 covered rental car ready/return staging and storage spaces on the first floor and approximately 800 uncovered storage spaces on the second floor. The facility will be located at 100 Corregidor Rd, Syracuse NY 13212. The construction will include the main parking facility, associated roadways, drainage, signage and all utilities. It also includes the construction of a 3,000 sq. ft. building in the same general location that will house the main electrical switchgear for the terminal. A comprehensive description of the Project can be found at Exhibit A to this RFP. 6.0% for Service-Disabled Veteran Owned Business (SDVOB) participation. FAAA.I.P. 3-36-0114-109-09 The intent of the Contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the Plans, Specifications, and terms of the Contract. A) This project generally consists of the replacement of overhead and ground-based signage on Col. Eileen Collins Boulevard (the airport entrance road), concrete sign bases; sign poles and masts; electrical and communications cable; installation of new LED signs, and all labor, materials and equipment necessary to completely install all new signage and related work. Additional project considerations include mobilization, phasing of the work, basic work zone traffic control measures and provision of an Engineer's Field Office. It is not intended that this description of work mention each particular item required, but that it gives general information concerning the general scope and areas of work for the convenience of bidders. Goals for Minority Participation 3.8% Goals for Female Participation 6.9%, DBE (15%)

Award

Service Station / Car Wash

$388,000.00

Public - City

New Construction, Site Work

348

112

403

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2026

February 2, 2026

Project location map

100 Corregidor Rd, North Syracuse, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.