Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 6, 2025 at 7:00 PM
Updated November 7, 2025
Site work for a water / sewer project in Rosenberg, Texas. Completed plans call for site work for a one-story above grade water / sewer project.
Project scope shall include the installation of approximately 5,460 LF of 8 PVC waterline; 4,775 LF of 8" PVC gravity sanitary sewer; and 4,855 LF of 18-72 RCP and polypropylene pipe storm sewer. The deadline to ask questions is 10/21/2025 2:00 PM CST Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online It is the responsibility of the Contractor bidding the project to ensure the accuracy of the reproduction of all Bid Documents and Construction Drawings. This includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the Unit Bid Quantities and/or Bid Amounts. a. Contractor shall commence and complete the Work generally described as follows: Water Distribution, Wastewater Collection and Storm Water Facilities to serve Brookewater Section Thirteen Fort Bend County Municipal Utility District No. 253, Fort Bend County, Texas, according to those particular Plans and Technical Specifications prepared by Edminster, Hinshaw, Russ & Associates, Inc. d/b/a EHRA ("Engineer") and all Extra Work in connection therewith, under the terms as stated in the Contract, and, at Contractor's own proper cost and expense, to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said Work, in accordance with the conditions and prices stated in the Bid attached hereto and in accordance with the Contract Documents, including, the Invitation to Bidders, Instructions to Bidders, Contractor's Bid, the Contract, Plans, and other drawings and printed or written explanatory matter thereof, and the Technical Specifications, on file with Engineer. Contractor represents and warrants to the Owner that it has carefully examined this Contract and all other Contract Documents, which are made a part of the Contract, and is thoroughly familiar therewith. b. Under this Contract and the Contract Documents, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in the Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. c. The Work, in general, under the Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. d. Major items of construction and services required are designated as follows: i. Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances ii. Construct and adjust sanitary sewer, manholes, and appurtenances iii. Repair existing pavement affected iv. Furnish and install all subsidiary items as necessary to complete the project v. Perform testing as specified on installed lines vi. Clean-up project area upon completion
Award
Water / Sewer
$1,876,675.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2025
December 18, 2025
Finney Vallet Rd & Klosterhoff Rd, Rosenberg, TX
Related To This Project
Rosenberg, TX
Bid Date: May 20 2021
Rosenberg, TX
--
Rosenberg, TX
Bid Date: Oct 09 2025
Rosenberg, TX
Bid Date: Oct 30 2025
Rosenberg, TX
Bid Date: Oct 13 2025
Rosenberg, TX
Bid Date: Dec 03 2025
Rosenberg, TX
Bid Date: Nov 06 2025
Rosenberg, TX
Bid Date: Nov 06 2025
Rosenberg, TX
Bid Date: Oct 15 2025
Rosenberg, TX
Bid Date: Aug 24 2021
Rosenberg, TX
Bid Date: Nov 06 2025
Rosenberg, TX
Bid Date: Oct 21 2025
Rosenberg, TX
Bid Date: Sep 23 2025
Rosenberg, TX
Bid Date: Oct 10 2025
Rosenberg, TX
Bid Date: Oct 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
