BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work and paving for a sidewalk / parking lot in Holly Springs, North Carolina. Conceptual plans call for site work for a one-story above grade sidewalk / parking lot.

The Town of Holly Springs is seeking qualifications from qualified consulting firms to provide professional engineering and design services for the Avent Ferry Road Festival Street in downtown Holly Springs. The design is anticipated to include a curbless street for flexibility, retractable bollards or entry features to separate the Festival Street from vehicular travel and protect pedestrians at entry points, paving materials and features that delineate vehicular areas and create a low-speed environment when vehicles are allowed, unique paving and vegetation to complement the downtown brand, enhanced landscaping for a large tree canopy and stormwater treatment, accommodations for periodic street closures for events while maintaining service to local businesses and public parking, street lighting, overhead string lights, gathering spaces, seating, public art, intersection improvements at Avent Ferry Road and W Ballentine Street for pedestrian safety, and other elements as determined in the design development process. No additional specific instructions to bidders are provided.

Conceptual

Sidewalks / Parking Lot

$4,500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
143
Bidding Soon
1,695
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2025

April 3, 2028

Project location map

Avent Ferry Road downtown Holly Springs, Holly Springs, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.