Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 23, 2026 at 7:00 PM
Updated January 27, 2026
Site work and addition to a mixed-use development in Holly Springs, North Carolina. Conceptual plans call for the addition of a playground / park / athletic field; and playground / park / athletic field.
The Town of Holly Springs is requesting qualifications from licensed design-build contractors for improvements at Parrish Womble Park. The project scope includes the addition of two new regulation-sized outdoor asphalt basketball courts with amenities (fences, benches, lighting, and ADA-compliant walkways to the parking area) and the removal and replacement of eight concrete-walled baseball dugouts with new modern aluminum chain-link dugout structures and separate storage areas. The design-build team must provide complete design, construction drawings for permit and construction, labor, materials, transportation, equipment, and all other necessary items to complete the project while adhering to all federal, state, and local requirements. The project has a total budget not to exceed $1,075,000, inclusive of all costs associated with the design, construction, and installation. The Town has a 10% M/W/SBE participation goal for this project.
Conceptual
Playgrounds / Parks / Athletic Fields
$1,075,000.00
Public - City
Addition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2026
July 1, 2026
300 Stinson Avenue, Holly Springs, NC
Related To This Project
Holly Springs, NC
Bid Date: Feb 03 2026
Holly Springs, NC
Bid Date: Feb 13 2026
Holly Springs, NC
--
Holly Springs, NC
Bid Date: Mar 17 2026
Holly Springs, NC
Bid Date: Feb 12 2026
Holly Springs, NC
--
Holly Springs, NC
--
Holly Springs, NC
Bid Date: Feb 24 2026
Holly Springs, NC
--
Holly Springs, NC
--
Holly Springs, NC
Bid Date: Dec 16 2025
Holly Springs, NC
Bid Date: Dec 18 2025
Holly Springs, NC
--
Holly Springs, NC
Bid Date: Dec 19 2025
Holly Springs, NC
Bid Date: Oct 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
