Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 26, 2025 at 7:00 PM
Updated November 27, 2025
Site work and new construction of a water / sewer project in Twin Falls, Idaho. Completed plans call for site work for a one-story above grade water / sewer project; and for the construction of a water / sewer project.
The work consists of the installation of a wellhouse and transmission main including deep well vertical turbine pump, discharge piping and appurtenances, flow meter vault, standby generator, site grading, drainage, fencing, 12-inch, 16-inch, 20-inch and 30-inch piping, dual fiber optic, a coulee crossing, connection at the South Tanks and related surface repairs. Bidders should refer to the Instructions to Bidders included in the Bidding Documents for requirements regarding bid submittal, qualifications, procedures, and contract award. Digital Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained elsewhere in electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other relevant information; all official notifications, addenda, and Bidding Documents will be offered only through this website. Neither the Owner nor Engineer will be responsible for incomplete sets of Bidding Documents obtained from other sources. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $1.9M - $2.2M. File- 60-19-058_G-001 PID- 20-015 Question Deadline 10/21/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Completion- (365) calendar days
Award
Water / Sewer
$2,395,826.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 28, 2025
December 29, 2025
Multiple Locations, Twin Falls, ID
Related To This Project
Twin Falls, ID
Bid Date: Nov 13 2025
Twin Falls, ID
Bid Date: Nov 05 2025
Twin Falls, ID
Bid Date: Nov 14 2025
Twin Falls, ID
Bid Date: Dec 10 2025
Twin Falls, ID
Bid Date: Nov 20 2025
Twin Falls, ID
Bid Date: Dec 02 2025
Twin Falls, ID
Bid Date: Dec 22 2025
Twin Falls, ID
--
Twin Falls, ID
Bid Date: Oct 20 2025
Twin Falls, ID
Bid Date: Sep 30 2025
Twin Falls, ID
Bid Date: Oct 08 2025
Twin Falls, ID
Bid Date: Sep 30 2025
Twin Falls, ID
Bid Date: Sep 09 2025
Twin Falls, ID
Bid Date: Aug 11 2025
Twin Falls, ID
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
