Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 5, 2025 at 7:00 PM
Updated November 6, 2025
Site work for a playground / park / athletic field in Peoria, Illinois. Completed plans call for site work for a one-story above grade playground / park / athletic field.
As of October 23, 2025, this project has not yet been awarded. A timeline for award has not yet been established. The project involves the installation of a 4" concrete slab to surround the installed sculpture foundation in Upper Bradley Park. The required scope includes installing an isolation joint between the slab and the existing foundation and installing dowel bars between the new slab and the existing sidewalk. Contractors must refer to the attached drawing and specifications for dimensions and material requirements. The work must be completed by November 30, 2025. Contractors are responsible for verifying all elevations and measurements before submitting quotes, contacting JULIE before digging, and ensuring compliance with all applicable local, state, and federal laws, regulations, rules, and national building codes. Prevailing wage rates as specified by the State of Illinois Department of Labor must be paid. The owner may engage a qualified independent testing agency for material evaluation and concrete mix design, and the contractor is required to cooperate with this agency to meet all standards and testing requirements.
Award
Playgrounds / Parks / Athletic Fields
$6,730.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2025
October 22, 2025
Upper Bradley Park 1125 W Lake Avenue Peoria IL, Peoria, IL
Related To This Project
Peoria, IL
Bid Date: Aug 19 2026
Peoria, IL
Bid Date: Mar 30 2021
Peoria, IL
Bid Date: Aug 04 2020
Peoria, IL
Bid Date: Oct 24 2025
Peoria, IL
Bid Date: Mar 19 2019
Peoria, IL
Bid Date: Nov 30 2021
Peoria, IL
Bid Date: Nov 20 2025
Peoria, IL
Bid Date: Nov 06 2025
Peoria, IL
Bid Date: Nov 07 2025
Peoria, IL
Bid Date: Nov 06 2025
Peoria, IL
Bid Date: Oct 14 2025
Peoria, IL
Bid Date: Oct 07 2025
Peoria, IL
Bid Date: Sep 22 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed