Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 5, 2025 at 7:00 PM
Updated December 6, 2025
Site work for a water / sewer project in Orlando, Florida. Completed plans call for site work for a water / sewer project.
Used to restore sites after emergency repairs, routine repairs, and maintenance work. Delivery and installation of soil, sod, flexible pavements, curbs, gutter, other incidentals that were damaged as a result of emergency and routine maintenance and repair activities. It is the respondent's responsibility to ensure they commence their upload efforts timely to meet the submission deadline. The County shall not be responsible for delays caused by any occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties. Consideration for modification or alteration of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other Contract documents shall be considered binding. The County shall be bound by information and statements only when such statements are written and executed under the authority of the Manager, Procurement Division. Answers for timely questions will be addressed in the question and answer module or as an addenda to this solicitation depending on volume, participants are encouraged to subscribe as a follower and monitor all notifications. Beyond questions and answers, any and all modifications, clarifications, interpretations and supplemental instructions will be in the form of a written addendum which, if issued, will be available for download. All addenda and questions/answers so issued shall become part of the Contract Documents and receipt shall be acknowledged as specified herein. This provision exists solely for the convenience and administrative efficiency of Orange County. No respondent or other third party gains any rights by virtue of this provision or the application thereof, nor shall any respondent or third party have any standing to sue or cause of action arising there from. Untcmely questions are unable to be submitted in the question and answer module, thereafter respondents raising critical concerns must email rochelle.chambers@ocfl.net. Critical clarifications may be made via addenda, however, untimely questions may not be considered. Question Deadline 10/27/2025 at 5:00 PM ET Timely questions concerning this solicitation shall be submitted electronically. Respondents are instructed not to contact the initiating division directly. additional pre bid meeting note: Join by video system Dial 23342746518@ocfl.webex.com You can also dial 173.243.2.68 and enter your meeting number. Join by phone 1-408-792-6300 Call-in toll number (US/Canada) Access code: 233 427 46518 Est.value- $35,976,703.00
GC Bidding
Water / Sewer
$35,976,703.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2025
February 16, 2026
Multiple Locations, Orlando, FL
Related To This Project
Orlando, FL
Bid Date: Nov 04 2025
Orlando, FL
Bid Date: Oct 24 2025
Orlando, FL
Bid Date: Oct 09 2025
Orlando, FL
Bid Date: Oct 23 2025
Orlando, FL
Bid Date: Oct 22 2025
Orlando, FL
Bid Date: Nov 13 2025
Orlando, FL
Bid Date: Nov 13 2025
Orlando, FL
Bid Date: Dec 09 2025
Orlando, FL
--
Orlando, FL
Bid Date: Oct 23 2025
Orlando, FL
--
Orlando, FL
Bid Date: Oct 20 2025
Orlando, FL
--
Orlando, FL
--
Orlando, FL
Bid Date: Oct 31 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
