Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
Renovation of a data center facility in Denver, Colorado. Completed plans call for the renovation of a data center facility.
Question Deadline 10/17/2025 at 12:00 PM MT The scope of services is for an HVAC Contractor (with an electrical subcontractor) to demolish and replace the existing CRAC unit and associated piping and ductwork, existing feeder, then install two (2) new CRAC units, BAS monitoring controls, UPS, and new feeder from existing transformer to the new UPS, based on the drawings and specifications dated 9/11/2025 by RMH Group. The goal of the project is to perform work with the least amount of interruption to building operation and occupants, scheduling this to keep the data center operating. Temp cooling will not be required since there two (2) CRAC units in the room, and the awarded Contractor is required to replace the units one at a time while using the opposite for room cooling. The electrical shutdown must be limited to the panelboard in the room and not the whole building, and is expected to take 10-12 hours, so a portable backup generator will need to be provided to power up the critical loads in this room including the fire alarm, servers, etc. Again, each CRAC unit can be replaced while the other is cooling the room. The Electrical scope shall be powering the above listed equipment and the system modification required, and replacing the existing rack-mount uninterruptible power supply (UPS) systems with new rack-mount or floor-mount UPS system. The engineering drawings included with this specification describe what is to be replaced, removed, or installed as new, and are to be bid upon by Contractors. The project duration is 6 months (180 days) from contract execution to substantial completion.
Award
Data Centers
$351,103.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
20
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2025
December 1, 2025
1156 7th St, Denver, CO
Related To This Project
Denver, CO
Bid Date: Oct 09 2025
Denver, CO
--
Denver, CO
Bid Date: Oct 14 2025
Denver, CO
Bid Date: Oct 31 2025
Denver, CO
Bid Date: Oct 14 2025
Denver, CO
Bid Date: Oct 24 2025
Denver, CO
--
Denver, CO
Bid Date: Oct 30 2025
Denver, CO
Bid Date: Oct 23 2025
Denver, CO
--
Denver, CO
Bid Date: Oct 30 2025
Denver, CO
Bid Date: Oct 30 2025
Denver, CO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.