Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 16, 2026
Renovation of a mixed-use development in Cheyenne, Wyoming. Completed plans call for the renovation of a medical facility.
The project includes electrical infrastructure upgrades such as panel replacements, normal and emergency power improvements, bonding, UPS enhancements, and new interfaces with the building management system. Mechanical work includes installing new HVAC systems, upgrading existing equipment, and modifying space to support reconfiguration, expansion, and renovation activities involving demolition, new construction, and interior finishes. The scope also expands space within the MFA, including demolition, new finishes, improved cable management, and cabinet relocation. Communication infrastructure improvements include installing new data outlets, patch panels, and upgrading cabling to Cat 6A in various buildings. Additional work includes physical security upgrades, hazardous material abatement, and enhancements to the campus-wide fiber backbone, including improvements within and between buildings, as well as installing a diversified WAN path to the new data center. Project locations encompass Building 1 (Arrowhead, Buffalo, Cowboy, Douglas Fir), Building 4, Building 5, Building 6, Building 7, Building 8, Building 11, Building 12, Building 13, Building 23, Building 45, the RRTP Building, and associated site areas. VAAR Magnitude of Construction: Between $20,000,000 - $50,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 03/30/2026 at 1:00 PM MT: Questions of a technical nature must be submitted by prospective offerors via e-mail to: Mica Tacderan Mica.Tacderan@va.gov and Jessica Hicks Jessica.Hicks1@va.gov. The subject line of each e-mail must read: EHRM Infrastructure Upgrades Cheyenne, WY - Technical Questions SES Project : 22449.000 Project #23001749.00 The Contractor shall begin performance within 10 calendar days and complete it within 730 calendar days.
GC Bidding
Medical
$50,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2026
June 1, 2026
2360 E Pershing Blvd, Cheyenne, WY
Related To This Project
Cheyenne, WY
Bid Date: Nov 13 2025
Cheyenne, WY
Bid Date: Nov 13 2025
Cheyenne, WY
Bid Date: Jun 25 2025
Cheyenne, WY
Bid Date: Nov 06 2025
Cheyenne, WY
Bid Date: Nov 12 2025
Cheyenne, WY
--
Cheyenne, WY
--
Cheyenne, WY
--
Cheyenne, WY
Bid Date: Oct 29 2025
Cheyenne, WY
--
Cheyenne, WY
Bid Date: Mar 13 2019
Cheyenne, WY
Bid Date: Sep 24 2021
Cheyenne, WY
Bid Date: Dec 29 2020
Cheyenne, WY
Bid Date: Sep 23 2021
Cheyenne, WY
Bid Date: Oct 22 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
