BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work and paving for a road / highway in Salina, Kansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of November 13th, 2025, this project has not yet been awarded. The project is expected to be awarded by the end of November 24th, 2025.** Item # Item Quantity Unit Unit Cost Extension 1 Mobilization 1 LS $ $ 2 Contractor Construction Staking 1 LS $ $ 3 Traffic Control 1 LS $ $ 4 Removal of Existing Structures 1 LS $ $ 5 Clearing and Grubbing 1 LS $ $ 6 Common Excavation 6,923 CY $ $ 7 Rock Excavation (Pavement Removal) 2,551 CY $ $ 8 Contractor Furnished Excavation 2,945 CY $ $ 9 Compaction Type B (MR-90) 9,868 CY $ $ 10 Concrete Pavement (10" Uniform) (AE) (NRDJ) 5,378 SY $ $ 11 Concrete Pavement (10" Uniform) (AE) 2,443 SY $ $ 12 Concrete Pavement (10" Uniform) (AE) (Plain) (Stamped and Colored) 398 SY $ $ 13 Concrete Pavement (6" Uniform) (AE) (Plain) (Stamped and Colored) 205 SY $ $ 14 6" Granular Base (AB-3) (Includes Geogrid Reinforcement) 10,107 SY $ $ 15 HMA Pavement (13.5") 530 SY $ $ 16 HMA Pavement (10") 68 SY $ $ 17 HMA Pavement (6") (Temporary) 2,243 SY $ $ 18 8" Subgrade 560 SY $ $ 19 AB-3 Gravel Surfacing (6") 66 SY $ $ 20 Concrete Driveway (6") 76 SY $ $ 21 Concrete Driveway (8") 205 SY $ $ 22 Concrete Sidewalk (4") 1,117 SY $ $ 23 Concrete Sidewalk (5") 975 SY $ $ 24 Sidewalk Ramp (5' Wide) (4" Thick) (AE) 26 SY $ $ 25 Sidewalk Ramp (10' Wide) (5" Thick) (AE) 70 SY $ $ 26 Curb & Gutter, Combined (AE) (Type I) 3,260 LF $ $ 27 Curb & Gutter, Combined (AE) (Type III) 870 LF $ $ 28 Curb & Gutter, Combined (AE) (Special) 363 LF $ $ 29 Protection Curb (AE) (9" Wide) (12" & Under) 46 LF $ $ 30 Protection Curb (AE) (9" Wide) (12"+) 45 LF $ $ 31 Guardrail (MGS) 113 LF $ $ 32 Guardrail End Terminal (MGS) 1 EA $ $ 33 6'x4' Inlet (Curb) (Setback) 11 EA $ $ 34 8'x4' Inlet (Curb) (Setback) 3 EA $ $ 35 Access Manhole 2 EA $ $ 36 Storm Sewer (18") (RCP) 848 LF $ $ 37 Storm Sewer (24") (RCP) 187 LF $ $ 38 End Section (18") (RCP) 1 EA $ $ 39 Reinforced Concrete Box (7'x9') (Precast) 624 LF $ $ 40 Reinforced Concrete Box Connection (7'x9') (Cast-in-Place) 4 EA $ $ 41 Reinforced Concrete Box Wingwall (7'x9') (Cast-in-Place) 1 EA $ $ 42 12" DIP Water Main 273 LF $ $ 43 12" MJ Gate Valve 1 EA $ $ 44 12"x 12" DIP 90 Degree MJ Bend 1 EA $ $ 45 12"x6" DIP MJ Tee 1 EA $ $ 46 Fire Hydrant and Valve Assembly 1 EA $ $ 47 Pavement Marking 1 LS $ $ 48 Signing 1 LS $ $ 49 Signals 1 LS $ $ 50 Seeding 1 LS $ $ 51 Erosion Control 1 LS $ $ 52 Adjust Manhole 1 EA $ $ 53 Mailbox Installation 1 EA $ $ Please contact the Department of Public Works/Engineering at 785-309-5725 with any questions in regard to the project. The City of Salina, Kansas, reserves the right to reject any or all proposals and to waive any irregularities therein.

Award

Roads / Highways

$3,782,767.00

Public - City

Paving, Site Work

141

8

4

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
13
Bidding Soon
269
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2025

December 5, 2025

Project location map

300 West Ash, Salina, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.