Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 25, 2025 at 8:00 PM
Updated October 26, 2025
This is a service / maintenance or supply contract in Hinton, Alberta. Contact the soliciting agency for additional information.
East River Road is located approximately 85 km west of the Town of Edson. It runs parallel to Highway 16 and provides access to developments near the eastern boundary of the Town of Hinton. Due to recurring water ponding issues during spring thaw seasons at property 24403 East River Road (refer to annexure B, location maps), Alberta Environment and Protected Services has reviewed the situation and requested that YHC develop an engineered storm water management plan for the surrounding area. he affected area has experienced significant runoff from hills overlooking East River Road. Recent development, undertaken without adequate storm water management planning, has disrupted the natural drainage patterns. Rather than flowing toward the creeks and tributaries of the Athabasca River, runoff now travels through residential properties 24425, 24415, and 24413 then flows northeast along the south ditch of East River Road, eventually stagnating at 24403 after passing through Crown land. The objective of this project is to analyze the drainage basin and watershed area under both rainfall and snowmelt runoff scenarios. A holistic approach is required to develop a stormwater management plan that complies with Alberta Environment's regulatory requirements. Questions Submission Deadline Wed Oct 22, 2025 4:00 pm (MT) : If you have questions, please contact Abid Malik Manager of Engineering Services .Questions must be submitted by email amalik@yhcounty.ca Address 2716 - 1st Avenue Edson, Alberta Canada T7E 1N9. Estimated Contract Start Date Nov 17, 2025 Estimated Contract End Date Nov 17, 2026 The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 17, 2025
E River Rd, Hinton, AB
Related To This Project
Hinton, AB
Bid Date: Nov 26 2025
Hinton, AB
Bid Date: Dec 03 2025
Hinton, AB
--
Hinton, AB
Bid Date: Aug 14 2025
Hinton, AB
Bid Date: Jul 30 2025
Hinton, AB
Bid Date: Aug 11 2025
Hinton, AB
Bid Date: Aug 11 2025
Hinton, AB
Bid Date: Jun 06 2025
RFP Contractor - Dr. Duncan Murray Recreation Centre - Aquatics Accessibility Enhancements - 5796678
Hinton, AB
Bid Date: Jun 20 2025
Hinton, AB
Bid Date: Jun 11 2025
Hinton, AB
Bid Date: Jun 06 2025
Hinton, AB
Bid Date: May 20 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
