BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2026 at 7:00 PM

Updated February 20, 2026

Renovation of an educational facility in Hinton, Alberta. Completed plans call for the renovation of a educational facility.

Evergreen Catholic Separate School Division is seeking a qualified contractor to complete the boiler plant replacement at St. Gregory Catholic School in Hinton, AB. Work includes demolition and removal of the existing boiler system, pumps, glycol system, heat exchanger, expansion tanks, venting, gas piping, unit heaters, and associated mechanical components. The project involves installation of new rack-style boilers, boiler circulators, boiler controller, secondary heating pumps, expansion tank, glycol fill tank, unit heaters, transfer fan, control valves, sensors, updated combustion air systems, and all required piping, venting, electrical, controls, and insulation as per specifications. Question Deadline 03/04/2026 at 2:00 PM MT

Sub-Bidding

Educational

$100,000.00

Public - State/Provincial

Renovation

17

11

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
11
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.