Site work and paving for a civil project in Miami, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
(Contractor must obtain and submit all permits prior to performing any work.) Services included in this proposal include material and labor, Base Scope of Work: Engineering oSurveying oEngineering plans oPermitting with DERM oShop Drawing Review and approval oSewer line certification and close out Site Work: o (500 SF) Asphalt Removal (based on 2" depth) Civil on-site Earthwork: o (500 SF) Limerock Base LBR 100 for Proposed Asphalt including compaction o No separate mobilization for the building pad is included. Sewer: o (90 LF) Remove existing 8" Cast Iron and replace with 8" PVC C-900, Existing Manholes to Remain o (2 EA) manholes are removed, disposed, and replaced $70,000.00. o Bypass for sewer installation will be achieved with a standby vac truck. o Pre and post CCTV of the line segment from MH to MH. o The roadway must be closed for this work. We can work at off-peak hours to minimize disruption to airport operations. We are expecting a 12am-7am working time. o MOT only includes cones and signs. No VMS or arrow boards, or police presence. o CCTV from the dog park to the airside as long as the camera fits in the pipe. o Emergency CCTV that was performed already is included in this pricing. o We are not including the pricing to remove the canopy. We need the canopy and electrician vendors from the airport to be able to remove a section of the canopy to cross the sewer and then reinstall it. Erosion Control: o N/A Pavement, markings and road work: o (100 SF) Grass restoration o (100 SF) Sidewalk restoration o (1 EA) Drainage removal o (300 SF) Asphalt S-III patch o Asphalt 1" Milling and 1" Resurfacing is not included. o No temporary or permanent striping included in proposal. General: o Surveyor Layout o Surveying for as-built o Final As-builts for our work o Any piping conflicts will be reviewed with a representative from Owner and dealt with accordingly. o One mobilization included. o Density testing for our work is included. o No dewatering is considered in our pricing. Options: 1. Vibration Monitoring - $2,500/Day 2. CCTV Drainage/Sewer Line - $8,000/Day - This is in case additional CCTV beyond what is included above is required. 3. Vacuum Truck - $700/HR - 4 hour minimum 4. GPR - $3,000/Day The method of Contractor Selection has not been Determined at this time.
Post-Bid
Water / Sewer
$488,793.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2025
November 13, 2025
2100 NW 42nd Ave, Miami, FL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.