Published December 23, 2025 at 7:00 PM

Updated December 24, 2025

Site work for a water / sewer project in Clearwater, Florida. Working plans call for site work for a water / sewer project.

The owner has selected a Construction Manager. A timeline for construction has not yet been established. The City of Clearwater is seeking Statements of Qualifications (SOQ) from experienced and qualified firms to provide Construction Manager at Risk (CMAR) services for the North Beach Stormwater Improvements Project (Project No. 24-0037-EN). This is a multi-phase effort anticipated to extend over approximately five years, with Phase 2 expected to exceed Phase 1 scope and complexity. The overall costs is expected to range between $45 million and $80 million, depending on the final scope. The City of Clearwater is preparing to advertise several other large roadway and utility replacement projects separately over the coming months (to be posted on OpenGov). The upcoming projects include: Osceola Streetscape & Utilities - estimated budget of $10 - $15 million Fort Harrison Streetscape & Utilities - estimated budget of $60 - $80 million across four (4) phases Nash Street Utilities - estimated budget of $10 - $15 million Question Deadline 11/01/2025 at 10:00 AM ET Questions will be received electronically. General, Process, or Technical Questions concerning this solicitation shall be submitted through the Citys e-Procurement Portal located online Review Responses: November 10-25, 2025 Presentations (if requested): Week of December 8, 2025 Award recommendation: Week of December 8, 2025 Council Authorization: January 2026 Contract Begins: January 2026 Pursuant to F. S. 252.505, any vendor who breaches a contract for commodities or services related to an emergency response for a natural emergency during an emergency recovery period shall pay a $5,000 penalty and damages, which may be either actual and consequential damages or liquidated damages. As used in this section, the term "emergency recovery period" means a 1-year period that begins on the date that the Governor initially declared a state of emergency for a natural emergency. The initial term is estimated to be from January 2026 through December 2030. The City reserves the right to extend the term of this contract, provided however, that the City shall give written notice of its intentions to extend this contract no later than thirty (30) days prior to the expiration date of the contract. The City reserves the right to reject any or all responses or any part thereof; to reissue the solicitation; to reject non-responsive or non-responsible responses; to reject unbalanced responses; to reject responses where the terms and/or awards are conditioned upon another event; to reject individual responses for failure to meet any requirement; to award by part or portion, or total; to make multiple awards; to waive minor irregularities, defects, omissions, technicalities or form errors in any response. The City may seek clarification of the response from respondent at any time, and failure to respond is cause for rejection. Submission of a response confers on respondent no right to an award or to a subsequent contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Pre-Construction/Negotiated

Water / Sewer

$80,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
108
Bidding Soon
1,746
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2025

March 10, 2026

Project location map

Multiple Locations, Clearwater, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.