BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 16, 2025 at 8:00 PM

Updated October 17, 2025

Site work for a water / sewer project in West Valley City, Utah. Conceptual plans call for site work for a water / sewer project.

The purpose of this Request for Proposal, hereinafter referred to as RFP, is to enter into a contract with a qualified firm to design, engineer and develop construction plans and documents for the Jordan River Access Project - Jordan River Parkway. The company hereinafter may be referred to by the following terms: Company, Firm, Consultant and/or Contractor. Riverton City hereinafter may be referred to as the City. The City will establish a question and answer sheet for this RFP. Please direct questions concerning this RFP in writing to: ccalvert@rivertonutah.gov Proposals must be concise and in outline format. Please furnish one (1) original copy and one (1) committee member copy of your proposal. Both are to electronic and should not exceed 5MG. The committee member copy is not to include pricing, do not include anything regarding pricing in the committee member copy; only purchasing will know the pricing during the scoring, committee members will not know the pricing. Pertinent supplemental information should be referenced and included as attachments. All proposals must be organized and tabbed to comply with the following sections. If they are not, they may be rejected. Each tabbed section must clearly and fully address the subject and be understandable. Failure to do so will negatively impact the evaluation of your submitted RFP. Proposals should be long enough to expand on the qualifications and experience; however, lengthy, encyclopedic RFPs are not encouraged. Proposals should not exceed twenty (20) pages, including covers, dividers and resumes. For contract purposes, completion of the scope of services through permitting must be completed by January 20, 2026. Final Design must be completed within 40 calendar days after receipt of the required permits. Because the timeline is part of a scored criterion, your proposed timeline completion may be sooner/shorter than the stated completion dates Return the riverbank to its original path and stabilize the west bank of the Jordan River along the Jordan River Parkway, North of Dr. O Roi Hardy Park, as identified in Section A-A, River Stabilization, attached. Provide design services for the river access and passive park area. An evaluation team will evaluate the submitted proposals. The city reserves the right to: 1) reject any or all proposals, or to make no award; 2) require modifications to initial proposals; 3) negotiate or 4) make partial or multiple awards. The city further reserves the right to excuse technical defects in a proposal when, in the sole discretion of the City, such excuse is beneficial to the city. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
57
Bidding Soon
1,039
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

Project location map

Jordan River Pkwy Trl, West Valley City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.