Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 14, 2026 at 7:00 PM
Updated January 15, 2026
Renovation of a transportation facility in San Francisco, California. Completed plans call for the renovation of a 516,644-square-foot transportation facility.
As of January 6, 2026, construction is underway. The goal of this project is to expand Terminal 3 by approximately 631,022 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility. The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. Description of the Trade Package Scope of Work: Turner seeks a single trade partner to furnish and install complete ceramic tile systems for floors and walls in pre-security, post-security, and C4C areas of the Terminal 3 West Modernization project. Scope includes substrate prep; mortars/adhesives; grout; movement/expansion joints; trims/edge protection; shop/layout drawings and mockups; protection and final cleaning; procurement of attic stock; and just-in-time deliveries with contractor offloading/hoisting. The contractor is expected to provide supervision, layout/survey, LEED v4.1/CALGreen documentation, coordination with adjacent trades, and safety controls for adhesive application, including unplanned out-of-sequence/leave-out areas across the various locations of the project.
Under Construction
Transportation Terminals
$5,300,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2025
January 6, 2026
To Be Determined, San Francisco, CA
Related To This Project
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Nov 10 2025
San Francisco, CA
Bid Date: Nov 07 2025
San Francisco, CA
--
San Francisco, CA
Bid Date: Nov 25 2025
San Francisco, CA
Bid Date: Nov 03 2025
San Francisco, CA
Bid Date: Nov 03 2025
San Francisco, CA
Bid Date: Nov 12 2025
San Francisco, CA
Bid Date: Feb 03 2026
San Francisco, CA
Bid Date: Nov 07 2025
San Francisco, CA
Bid Date: Oct 29 2025
San Francisco, CA
Bid Date: Oct 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
