Published August 28, 2026 at 8:00 PM

Updated September 3, 2026

Renovation of a data center facility in Raleigh, North Carolina. Completed plans call for the renovation of a data center facility.

Wiley Wilson has been engaged to provide electrical engineering design services for the replacement of three existing battery strings that support the critical Uninterruptible Power Supply (UPS) infrastructure at the North Carolina Department of Information Technology's Eastern Data Center in Raleigh, North Carolina. These battery strings form the stored-energy backbone of the facility's power continuity system, allowing the three 825kVA UPS modules to maintain conditioned, uninterrupted power to vital information-technology operations. Over time, the original valve-regulated lead-acid (VRLA) batteries serving Strings A, B, and C have reached the end of their useful service life and now require full replacement. The purpose of this project is to remove and replace these aging batteries with new equipment that matches the electrical and physical characteristics of the newer battery units currently installed in String D, ensuring long-term reliability and uniformity across the UPS installation. As part of the replacement effort, each battery string will undergo post-installation performance testing to verify proper operation, confirm correct integration with the associated UPS, and ensure the system meets its intended capacity and discharge characteristics before being returned to service. The project includes design development, bidding phase support, and construction administration services, with a focus on maintaining continuous operation of the data center's critical loads throughout construction. Because the replacement batteries are identical in form, fit, and functional performance to the units already in service, the effort is limited entirely to electrical work. All existing battery racks, raceways, monitoring systems, and UPS infrastructure will remain in place, and no architectural, mechanical, plumbing, or structural modifications are needed. Field surveys, site visits, and review of the facility's existing documentation inform the basis for design and allow the project team to coordinate a safe and efficient phased approach to battery replacement. The State Reserves the Unqualified Right to Reject Any and All Proposals.

GC Bidding

Data Centers

$2,004,000.00

Public - State/Provincial

Renovation

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
96
Bidding Soon
1,782
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2026

October 15, 2026

Project location map

3700 Wake Forest Rd, Raleigh, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.